My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8448-93 Authorizing City of South Bend Economic Development Revenue Refunding Bonds (First Bank Center Project) $8,030,384.77
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1993
>
8448-93 Authorizing City of South Bend Economic Development Revenue Refunding Bonds (First Bank Center Project) $8,030,384.77
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 4:22:24 PM
Creation date
10/1/2012 2:09:23 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
12/13/1993
Ord-Res Number
8443-93
Bill Number
108-93
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 2.12. Environmental Indemnity Agreement. You shall receive on the Closing <br />Date an Environmental Indemnity Agreement in the form attached hereto as Exhibit N (the <br />"Environmental Indemnity"). <br />Section 2.13. Environmental Protection; Audit. (a) You shall have received evidence <br />satisfactory to you of the issuance, on terms satisfactory to you, by the appropriate Federal, <br />state, county, regional or local authorities, of all licenses, approvals or permits necessary in <br />connection with the operation of the Project and lawful occupancy thereof for the purpose <br />for which such Project was created (including the issuance by any Federal, state, county, <br />regional or local authority whose jurisdiction involves environmental protection of any such <br />licenses, approvals or permits). <br />(b) Not less than ten (10) days before the Closing Date, you shall have <br />received and approved a Phase I environmental report prepared by an accredited <br />environmental engineer certifying that the Project is free of toxic and /or Hazardous Wastes. <br />This Phase I environmental report shall include the following items: <br />1. A review of the Project and surrounding land use history including a <br />review of time comparison aerial photography; <br />2. Findings as a result of contact with Federal, State and Local regulatory <br />officials regarding possible chemical releases, site investigations, environmental <br />actions or past permits relating to the Project; <br />3. A site inspection, including a walk- through by an environmental engineer <br />and /or chemical engineer; <br />4. An interview with any current tenants to identify potential past and/or <br />present uses of toxic Hazardous Materials; and <br />5. A review of matters of record affecting the Project. <br />Dependent upon the results of the Phase I report, additional testing and reports (including, <br />but not limited to a Phase II environmental report) may be required. <br />Section 2.14. Engineer's Report. You shall have received, not less than ten (10) days <br />before the Closing Date, a report prepared by , addressing the <br />structural and mechanical integrity of the Project (the "Engineer's Report"). The Engineer's <br />Report shall be dated as of a current date and shall be satisfactory to you in all respects. <br />SECTION 3. WARRANTIES AND REPRESENTATIONS OF THE ISSUER. <br />The Issuer warrants and represents to you and to the Borrower that each of the <br />representations and warranties of the Issuer set forth in Section 2.1 of the Loan Agreement <br />is true and correct as of the date of execution and delivery hereof. <br />I on <br />
The URL can be used to link to this page
Your browser does not support the video tag.