My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-12 Redevelopment Commission Special Meeting Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2010-2019
>
2012
>
08-28-12 Redevelopment Commission Special Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2012 12:08:28 PM
Creation date
9/28/2012 12:08:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br /> Regular Meeting—August 28, 2012 <br /> 2. NEW BUSINESS <br /> A. South Side Development Area <br /> (1) Presentation concerning public safety and <br /> traffic circulation in the Fellows- <br /> Chippewa-Ireland corridor. <br /> Ms. Jones noted that the meeting would be <br /> run similar to the Commission's public <br /> hearings, except that no action will be taken <br /> at the end of the hearing. Mr. Schalliol will <br /> give the history of the project and planning <br /> for it. Mr. Durr will describe the plans that <br /> are under consideration. Following the <br /> presentations there will be time for public <br /> comments, limited to two minutes per person <br /> Mr. Schalliol noted that in 2010, the State of <br /> Indiana made a decision that it would build <br /> several pieces of infrastructure related to <br /> improvements on U.S. 31. One piece was to <br /> build a bridge from south of the U.S. 31 <br /> bypass to north of the bypass, along a <br /> Fellows Street corridor that would serve as a <br /> local reliever for traffic from south of the <br /> bypass to Ireland Road. The state is <br /> committed to this project and is currently in <br /> the process of building that roadway from <br /> south of the bypass to Ireland Road: several <br /> properties have been cleared; the right of way <br /> and the bridge pier is under construction. <br /> As a response to that, the city has engaged in <br /> a larger traffic master planning effort to <br /> determine how that piece of roadway would <br /> affect the immediate Fellows Street <br /> neighborhood as well as general circulation <br /> on the south side. In 2010, the city hired <br /> Christopher Burke Engineering to prepare <br /> early concepts for ways the city might deal <br /> with an estimated 8,000 additional cars <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.