Laserfiche WebLink
Section 15.6 Conditions Relating to Uninstalled Materials. The advancements to which <br /> Borrower shall be entitled with respect to Uninstalled Materials shall be subject to such funding <br /> conditions as MBI may from time to time require in its sole reasonable discretion. Notwithstanding <br /> anything contained herein to the contrary, MBI shall have no obligation to advance more than One <br /> Hundred Thousand and 00/100 Dollars ($100,000.00) at any time for Uninstalled Materials. The <br /> funding conditions required by MBI for Uninstalled Materials may include, without limitation, the <br /> following: (i) that Borrower provides proof the Uninstalled Materials are fully insured in a manner <br /> acceptable to MBI, (ii)the Uninstalled Materials have been inspected by a third party acceptable to MBI, <br /> (iii) MBI has been furnished with satisfactory evidence that title to the Uninstalled Materials has been <br /> transferred to Borrower free and clear of all liens and security interests except the lien and security <br /> interest granted to MBI, (iv) the Uninstalled Materials are stored in a manner and at a location that <br /> provides for a level of security acceptable to MBI, (v)the amount of the Loan funded for any Uninstalled <br /> Materials may not include any costs for the installation of such Uninstalled Materials into the Project, and <br /> (vi) all Uninstalled Materials must be incorporated into the project within sixty (60) days of either the <br /> date Loan proceeds were advanced for such Uninstalled Materials, or sixty (60) days from the date the <br /> Uninstalled Materials were purchased by Borrower as an equity contribution by Borrower to the Project. <br /> MBI shall have the right from time to time to inspect any Uninstalled Materials until they are <br /> incorporated into the Project. Borrower shall reimburse MBI upon demand for all costs incurred in <br /> connection with inspection of Uninstalled Materials. <br /> Section 15.7 Retainage Requirements. MBI shall have the right, at its reasonable sole <br /> discretion, to require a ten percent (10%) retainage be withheld from advancements under the Loan for <br /> any construction cost. Any retainage reasonably required by MBI shall be funded upon the completion of <br /> the work, in a manner acceptable to MBI, of the construction item for which the retainage was required. <br /> Section 15.8 Advancements for Line Items. The Development Budget includes as line items <br /> the cost of all labor, materials, equipment, fixtures and furnishings needed for the completion of the <br /> construction or rehabilitation of the Improvements, and all other costs, fees and expenses relating in any <br /> way whatsoever to the development of the Project and the operation of the Project prior to the Target <br /> Completion Date. Borrower agrees that each advancement under the Loan shall be used only for the <br /> payment of those line item costs on the Development Budget for which the Draw Request specifically <br /> references. Except as specifically permitted in this Agreement, MBI shall not be obligated to make any <br /> advancements for any category of costs set forth as a line item on the Development Budget which is <br /> greater than the amount set forth for such category in the Development Budget. Except for the line item <br /> for the Interest Reserve and subject to MBI's prior consent (which consent shall not be unreasonably <br /> withheld, conditioned, or delayed), Borrower may apply savings from one category of line item costs on <br /> the Development Budget to cost overruns in another category of line item costs on the Development <br /> Budget or to the contingency fund line item on the Development Budget, or to any other unbudgeted cost, <br /> provided: (i)no Event of Default then exists hereunder, (ii) all costs to be paid out of the category of line <br /> item costs from which funds are being reallocated have been paid or sufficient sums remain in said line <br /> item to pay such costs when the same become due, or (iii) said savings are actual savings and are <br /> documented to the satisfaction of MBI and the Construction Consultant in their discretion. <br /> Section 15.9 Unsatisfactory Work. If the Construction Consultant or MBI shall determine that <br /> any Unsatisfactory Work has occurred, MBI shall be entitled to (i) withhold from advancements of the <br /> Loan such amounts which are intended to pay for the correction of the Unsatisfactory Work and (ii) <br /> require the construction work on such portion of the Improvements to be stopped until such time as MBI <br /> and the Construction Consultant are satisfied that the Unsatisfactory Work is corrected. No such action <br /> by MBI shall be deemed to affect Borrower's obligation to complete the Improvements on or before the <br /> Target Completion Date. MBI shall, subject to compliance by Borrower with all other applicable <br /> requirements of this Agreement, be required to make advancements of the Loan with respect to such <br /> Page 54 <br />