My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - CSO 003 Backwater Valve Replacement Proj No. 119-113 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - CSO 003 Backwater Valve Replacement Proj No. 119-113 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 1:02:01 PM
Creation date
3/11/2020 11:05:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S BID FOR PUBLIC WORK <br />Project Name CSO 003 Backwater Valve Replacement <br />Project No. 119-113 <br />For Bids Due March 1 <br />PART <br />(Must be completed for all bids. Please type or print) <br />..................._.�...-...-............................................................. ( ) _._........................... ._.._... Inc. <br />Date: 3 10/2020 Bidder Firm : Sel e Construction Co. <br />Address: 2833 S. 11th Street <br />City/State/Zip: Niles MI 49120wwwww Telephone Number: ( 269 ) 684-0842 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />CSO 003 Backwater Valve Replacement <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by:. <br />American Structurepoint <br />and dated Febmiary 17. gn9n for the sum of (enter the Total Bid as shown on the Proposal) <br />One Hundred Nine Thousand - <br />(Enter Hundred Twenty Five & 00. __$ 109, 925.00 <br />(Enter sum of Total Base Bid) Dollars (Nu �.� <br />merical) <br />Mandatory Alternative: $65.700.00 <br />Enter Deductive Cost to accept Mandatory Alterante `V21 .500.00 (Numerical <br />The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in <br />the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance <br />with the notice. Any addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that <br />shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit <br />basis, the itemization of the units shall be shown on a separate attachment. <br />By �', <br />(Signature) — <br />JustM Butler, Director, Operations <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above bid is accepted this day of 20 <br />Subject to the following conditions: <br />Version 01/29/2020 Contractor's Bid for Public Works - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.