My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Pinhook Park Pavilion Improvements Proj No. 118-077B - Larson-Danielson Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 1 - Pinhook Park Pavilion Improvements Proj No. 118-077B - Larson-Danielson Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:53:06 AM
Creation date
3/11/2020 10:52:25 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MLARSON <br />41 N <br />C'mainiction Company, Inc. <br />To: Alicia Czarnecki <br />SOUTH BEND, CITY OF <br />227 W. JEFFERSON ST. <br />SOUTH BEND, IN 46601 <br />Ph: (574)235-0311 <br />Description: Plumbing wall patching <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph : 219-362-2127 <br />Change Request I <br />Number: 3 <br />Date: 2/14/20 <br />Job: 56-506 SOUTH BEND,CTY OF-PINHOOK PARK <br />Phone: <br />We are pleased to offer the following specifications and pricing to make the following changes: <br />Price #1 to install ceramic tile over existing glazed block. The ceramic tile will be placed 48" AFF on the women's East wall and the <br />men's West wall. Unfortunately the plumber has since told me that this might not be a great option as the existing cast <br />connections that have been in for a long time will break if he trys to extend them when connecting the new fixtures. He assurred me <br />they are solid as long as we don't touch them. <br />* - subcontract $1688 <br />* - 10% M/U $187.37 <br />Total $ 1875.37 <br />Price #2 - Replace block to patch holes with white block currently in suppliers stock. Sand, prime, and paint entire bathroom to <br />match painting done in lobby and hallway leading into the restrooms. <br />* - Masonry block material $ 509 <br />* - subcontract $ 1880 <br />* - M/U $ 290.88 <br />Total $ 2679.88 <br />1 did price a 6' stainless option with trims to replace the ceramic tile option since the plumber wasn't liking that option, but the total <br />ended up around $5750. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.