My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Pinhook Park Pavilion Improvements Proj No. 118-077B - Larson-Danielson Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 1 - Pinhook Park Pavilion Improvements Proj No. 118-077B - Larson-Danielson Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:53:06 AM
Creation date
3/11/2020 10:52:25 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 1 18-077B project Name: Pinhook Park Pavilion Improvements Change Order #: 1 <br />DATE INITIATED: 2/20/2020 wwww BPW DATE:mmmmmmm„rvry <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />1- Replace existing faulty gate valve. $388.85 <br />2- Replace existing faulty sanitary drains. $6,932.22 <br />3- Replace broken glazed block in restrooms and paint walls to match. $2,679.88 <br />4- Substitute block filler with extreme bond to prep walls in lobby and hallway for paint. $1,222.10 <br />5- Upgrade to larger server rack to accommodate additional A/V and IT needs. $962.13 <br />6- Add painting of bathroom ceilings to scope of work. $611.05 <br />Attachments: (List documents support change — required) <br />Contractor's Change Requests 1-6 <br />PCR #001 <br />Amount of 9Increase / El Decrease. $ 12,796.23 <br />Categories (Pick One) <br />Previously approved Change Order(s): " IM Scope of Work <br />"""""— ❑ Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 7'78 % ❑ Conflicted Specifications and Drawings <br />177,367.23 ❑Failed Materials <br />New Total Amount: $_ ❑ Error <br />Total Percent of Change:_7.78� <br />❑ Omission <br />❑ Final Quantity Adjustment <br />Funding Secured From;,. 14 n ❑ <br />(filled out by PM) d <br />RECOMMENDED BY: <br />Greg McGowan 2/24/2020 <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />Construction M I � e <br />ager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />koa <br />7lt4liq <br />Engineering Project Manager (Print Name) (Signature) (Date <br />APP'RO Y': <br />i <br />City <br />� ... <br />En Ine g' er (Print Na e) (Signature) (Dat ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.