Laserfiche WebLink
STORAGE AND HANDLING HOW TO MEASUREEstimating the Required Materials <br /> If bundles are to be stored outside, do not lay them directly ■ All houses can be broken down into shapes of <br /> on the ground. Lay them on wood supports(e.g. 2X4) rectangles or triangles, or a combination of both. <br /> Do not store under tarps. <br /> Do not store bundles upright. ■ The area to be sided can be determined by measuring <br /> Do not store bundles more than 5 high. the height and width of the house, including windows. <br /> Keep away <br /> from heat sources. • Total all of the measurements for the areas to be sided. <br /> Keep cartons dry until opened Windows and doors are not usually deducted.including <br /> IMPORTANT:not Handlingstack on Celect cornerCorners <br /> Posts them will provide an allowance factor for waste.If the <br /> • Do neo top of orners <br /> Store corners on level surface windows and doors are extremely large (such as a garage <br /> • or sliding glass doors), some deductions can be made <br /> • Store out of direct sunlight <br /> • Keep corners in pack until installed. ■ To estimate the amount of starter strip required, <br /> measure the linear feet around the entire base of the <br /> WALL PREPARATION house. <br /> Celect siding is a rain screen but not intended to be a • Add siding to all material estimates to allow for waste, <br /> water resistive barrier.Therefore, Celect siding must be depending on the pitch of the roof and other house- <br /> specific factors. <br /> installed over a continuous water-resistive barrier with <br /> properly integrated flashing. • Ever 100 square feet(9.29 square meters)s called a <br /> Celect must be applied over rigid sheathing that provides a °squareyforordering purposes. <br /> smooth flat surface. Never install Celect siding directly to <br /> open framing/studs. Celect must be installed over either <br /> solid nailable sheathing, rigid sheathing with minimum 1X6 <br /> furring strips or rigid sheathing and elongating the nailing <br /> AN <br /> slots(page 22). <br /> Re-siding <br /> It may not be necessary to remove existing siding providing <br /> all loose boards are re-secured and any rotten boards areBHreplaced. Install furring strips or wall levelingslidn gFollow height <br /> underlayment to create a flat surface for the g ��_ <br /> all other details outlined above. <br /> KEY RULES �1linliii�y1I l l MIIIMINIMMIIIIIIIMBI�,lltl <br /> • Nail in the center of the nailing slot unless pinning is II 141 it l Il j I I I l �' ►I ( �I <br /> necessary. Horizontal Siding and Shingles <br /> • Fasteners must be placed in the center of the nailing square <br /> slots at approximately 16" spacing leaving about 1/32" Height feet (meters)x width feet(meters) = q <br /> between the head of the fastener and the nailing hem <br /> feet(square meters) <br /> of the panel. Celect panels expand and contractthVertical Siding(Pieces of vertical siding) <br /> Neverface nail therp panels.sNumber of panels at_inches(mm)wide and 10 feet long <br /> Never nail width feet(meters) , _inches (mm) <br /> • 13 <br /> 12 <br />