Laserfiche WebLink
PANEL INSTALLATION <br /> • The length of the panel should be 1" from the top <br /> PANEL INSTALLATION CONT'D <br /> furring and a minimum of 1/2" over the foundation <br /> at the bottom (Fig. 5) • Continue installing panels across the wall making <br /> • Install the first panel by placing the cut edge along certain that 1)the lock is fully engaged and 2) the <br /> the chalk line. panel is "pinned" into place by 1 fastener within <br /> • Hold the panel in place by placing the first fastener 12" of the bottom of the panel. <br /> at the top of a nailing slot no more than 12" from • For the best look, make sure that all the panels are <br /> the bottom edge of the panel. Do not drive tight. even across the bottom of the wall. <br /> Leave approximately 1/32" between the head and • When cutting and installing around windows, <br /> the panel. doors, etc., allow for 1/2" gap along any vertical <br /> • Make sure the panel is plumb and continue cuts always and 1/2" along horizontal cuts up to 8' <br /> fastening it placing the fasteners in the center of and 1" beyond 8' (Fig 7) <br /> the slots at 8"-12" intervals (Fig. 6) <br /> - <br /> 1" Gap l <br /> r; 4— <br /> .11 1 11 1 <br /> Center of all other <br /> ' slots io— —1/2" gap on vertical <br /> at 8"-12"intervals cuts <br /> • <br /> y, .I T \1/2„ gap on <br /> horizontal cuts up to <br /> • <br /> • <br /> F 8' from pin nail. <br /> • Top of 1 slot -F 1-1" gap beyond 8' <br /> within 12" I <br /> from bottom. LFig. 7 <br /> Fig, 6 --'''' t"----"/ 'I( / <br /> 32 33 <br />