My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2020 Agenda Packet
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2020
>
03-09-2020
>
03-09-2020 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 3:28:58 PM
Creation date
3/5/2020 3:15:34 PM
Metadata
Fields
Template:
City Council - City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
677
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FIXTURE MOUNTS TOP COURSE INSTALLATION <br />Celect fixture mounts are available for Depending upon the trim you choose to you use to <br />obstructions such as lighting, dryer vents, water finish the top of the wall, measure and cut the top <br />faucets, etc. Begin by installing the base "ring". course panel to fit. A freeze board, finish or gable <br />Install the siding panels allowing for the trim can be applied to cover the fasteners a give a <br />appropriate expansion gap depending upon the finished appearance. <br />length of the siding course. Center and secure Install the panel securing it by placing nails along <br />the face plate with two Celect Cortex trim screws the cut edge of the panel approximately every 16". <br />and plugs (Fig The head of the nails will hold the panel back to the <br />10) wall and the shaft of the nail will keep the panel <br />Fixturefrom raising and becoming unlocked from the panel <br />mounts can below it (Fig 12). Pin each panel in place by placing <br />also be field r---1one nail through the panel itself toward the middle <br />constructed Base of the panel (Fig 13). <br />using L_J <br />Cellular <br />PVC, wood, <br />etc. Allow <br />for the Cover Plate <br />appropriate <br />3/8" Fig. 10Hi' 1/ <br />4,y" <br />expansion <br />gap. <br />ROOF LINES Fig. 12 7 A <br />When working up over roof lines, hold the shake <br />v11/ <br />4" <br />panels off the roof line a minimum of 1/2". No <br />additional trim is needed. (Fig. 11) <br />Finish Trim <br />1/2" off of or <br />pppr- <br />roofline Gable trim <br />with no <br />channel. <br />Pin the center <br />Tuck behind <br />fascia <br />i Fig 13 , <br />Fig.11 L -10 <br />44 45
The URL can be used to link to this page
Your browser does not support the video tag.