Laserfiche WebLink
PANEL INSTALLATION • <br />The length of the panel should be 1" from the top PANEL INSTALLATION CONT'D <br />furring and a minimum of 1/2" over the foundation Continue installing panels across the wall making <br />at the bottom (Fig. 5) certain that 1)the lock is fully engaged and 2)the <br />Install the first panel by placing the cut edge along panel is "pinned" into place by 1 fastener within <br />the chalk line. 12" of the bottom of the panel. <br />Hold the panel in place by placing the first fastener For the best look, make sure that all the panels are <br />at the top of a nailing slot no more than 12" from even across the bottom of the wall. <br />the bottom edge of the panel. Do not drive tight. <br />When cutting and installing around windows, <br />the panel. <br />approximately 1/32" between the head and doors, etc., allow for 1/2" gap along any vertical <br />the cuts always and 1/2" along horizontal cuts up to 8' <br />Make sure the panel is plumb and continue and 1" beyond 8' (Fig 7) <br />fastening it placing the fasteners in the center of <br />the slots at 8"-12" intervals (Fig. 6) <br />li <br />i <br />1" Gap i <br />t f- <br />11 1 III <br />I.I 1 <br />other <br />4 Center of all 1/2" gap on vertical <br />slots <br />1— <br />cuts <br />at 8" 12"intervals I <br />I I 1/2^ gap on <br />i I t i <br />11 horizontal cuts up to <br />8' from pin nail.k 1-1" gap beyond 8' <br />RP Top of 1 slot I <br />within 12" <br />from bottom. Fig. 7 a/ <br />Fig. 6 i( <br />s1 <br />33 <br />32