Laserfiche WebLink
BOARD AND BATTEN INSTALLATION INSIDE CORNER POSTS <br />i <br />Inside corner posts are the only finish "trim" piece to <br />BOARD AND BATTEN R <br />be installed prior to the siding. panels. <br />Install any inside corners. Fasten the inside <br />O Weather Barrier&Flashings Furring <br />AI% corners using weather resistant screws placed <br />Furring strips for trim Strips --1— 1 inside the pocket of the corner no more than 16" <br />Inside Corner Posts 1111E11apart. Unlike the other finished trim, inside <br />W Board&Batten Siding Panels <br />If m10' <br />Windondow,Door,Etc.Trim <br />jore <br />than corners are applied before the siding. <br />NOTE: Make sure not to draw the pocket in when <br />fastening to the wall. <br />Fig.1 ' >, <br />L <br />The pocket width must remain 3/4". Use a scrap <br />After preparing the walls for the siding installation (see piece of siding as a spacer in the pocket. The <br />Wall preparation pg. 8), install 1X2 furring around all inside of the corner post should not lay against <br />windows, doors, outside corners, etc.This must be done the siding. <br />anywhere the ends of the siding terminate with the As a general rule, you will install panels from the <br />exception of along the bottom of the course up to 10'. If inside corner outward on both sides. <br />the panels are longer than 10'a furring strip and trim if installing between two inside corners, 1) <br />will be neccessary along the bottom as well. (Fig 1-2) install one inside corner, 2) install the panels <br />Make sure to install the proper flashing as required by then, 3) install the other inside corner. This way <br />specific local building codes (Fig 2) you can secure the last panel going into the <br />NOTE: If no solid nailable substrate exists, either furring second inside corner. Note that you will only be <br />strips Installed horizontally at 12" spacing or solid nailable able to secure the second inside corner on one <br />sheathing MUST be applied prior to the installation of the side. Be careful to keep it even and square to the <br />vertical panels. corner. <br />1 <br />Flashing 1Ip' Ga 44Salong <br />e horizontal <br />lines <br />IX Install inside corners prior to siding <br />II <br />Window Header o <br />L 1 <br />iim• <br />mw <br />o <br />t/2" Gap <br />along vertical y <br />lines <br />Io <br />1X2 Furring Strip , ' Fig. 2 <br />1 <br />29 <br />28