My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 W Navarre_AA 2020-0227
sbend
>
Public
>
Historic Preservation
>
2020
>
Agendas & Packets
>
March
>
Administrative Approvals
>
304 W Navarre_AA 2020-0227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 9:20:36 AM
Creation date
3/5/2020 9:20:25 AM
Metadata
Fields
Template:
South Bend HPC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> <br />If you have before and after pictures that would be helpful. Thanks! <br /> <br /> <br />From: Chris <chrisdavis304@gmail.com> <br />Sent: Tuesday, January 21, 2020 3:19:12 PM <br />To: Elicia Feasel <efeasel@southbendin.gov> <br />Subject: Re: 304 W Navarre ‐ Certificate of Appropriateness <br /> <br />Hi, Elicia! Thanks for getting back to me. <br /> <br />The existing door had to be replaced due to water damage to the door and subsequent <br />warping causing a 1” gap in the frame. This allowed direct access to the interior. <br />Additionally the side lights that were installed with the door were not actually windows, <br />rather, double sided sheets of glass that had been made to look like windows. There <br />was a lack of sealing around said windows. <br /> <br />In regards to the replacement work on the trim, I’m assuming that you’ll need the <br />before pics, is that right? <br /> <br />Thanks again ‐ <br />Chris <br /> <br />Sent from my iPhone <br /> <br />> On Jan 21, 2020, at 12:37 PM, Elicia Feasel <efeasel@southbendin.gov> wrote: <br />> <br />> Mr and Mrs Davis ‐ <br />> <br />> Historic Preservation Commission is in receipt of a COA application to replace wood <br />trim and a door on west side. Thank you for providing details of the project along with <br />the manufacturer specification for the door. To complete the application (page 3 <br />checklist), please email photographs of the project areas. Don't worry about providing a <br />blueprint or site plan with this project. Can you also expand the description of proposed <br />work describing the need for the change in the door. <br />> <br />> Once photographs and description update is received, this project will likely be qualify <br />to be processed as an Administrative Approval. <br />> <br />> Thank you, <br />> <br />> Elicia <br />> <br />> ‐‐‐‐‐Original Message‐‐‐‐‐ <br />> From: Elicia Feasel <br />> Sent: Monday, December 2, 2019 9:57 AM <br />> To: Chris <chrisdavis304@gmail.com> <br />> Cc: Adam Toering <atoering@southbendin.gov> <br />> Subject: RE: Permit Required / Chapin Park <br />> <br />> Greetings ‐ <br />>
The URL can be used to link to this page
Your browser does not support the video tag.