Laserfiche WebLink
PANEL INSTALLATION . <br /> • The length of the panel should be 1" from the top PANEL INSTALLATION CONT'D <br /> furring and a minimum of 1/2" over the foundation <br /> at the bottom (Fig. 5) • Continue installing panels across the wall making <br /> • Install the first panel by placing the cut edge along certain that 1)the lock is fully engaged and 2)the <br /> the chalk line, panel is "pinned" into place by 1 fastener within <br /> • Hold the panel in place by placing the first fastener 12" of the bottom of the panel. <br /> at the top of a nailing slot no more than 12"from • For the best look, make sure that all the panels are <br /> the bottom edge of the panel. Do not drive tight. even across the bottom of the wall. <br /> Leave approximately 1/32" between the head and • When cutting and installing around windows, <br /> the panel. doors, etc., allow for 1/2" gap along any vertical <br /> • Make sure the panel is plumb and continue cuts always and 1/2" along horizontal cuts up to 8' <br /> fastening it placing the fasteners in the center of and 1" beyond 8' (Fig 7) <br /> the slots at 8"-12" intervals (Fig. 6) <br /> - <br /> — <br /> 1-,11----________-L� " ap ' <br /> I` 1 4- f-' <br /> l I <br /> ME 0 <br /> '!' I I I I I 1 ' MEI <br /> Center of all other <br /> slots 1— ~1/2" gap on vertical <br /> • <br /> at 8"-12"intervals <br /> cuts <br /> IL__I___1 <br /> II, II4i R�\1/2" gap on <br /> • <br /> f— horizontal cuts up to <br /> ' 8' from pin nail. <br /> i <br /> I <br /> 0 Top of 1 slot ! • I I 1-1" gap beyond 8' <br /> ii____, within 12" <br /> from bottom. Fig. 7 ti- Ii <br /> • <br /> t <br /> Fig. 6 '. di y, <br /> 32 33 <br />