Laserfiche WebLink
STORAGE AND HANDLING HOW TO MEASURE <br /> If bundles are to be stored outside, do not lay them directly Estimating the Required Materials <br /> on the ground. Lay them on wood supports(e.g. 2X4) ■ All houses can be broken down into shapes of <br /> Do not store under tarps. rectangles or triangles, or a combination of both. <br /> Do not store bundles upright. <br /> Do not store bundles more than 5 high. ■ The area to be sided can be determined by measuring <br /> Keep away from heat sources. the height and width of the house, including windows. <br /> Keep cartons dry until opened • Total all of the measurements for the areas to be sided. <br /> IMPORTANT: Handling of Celect Corner Posts Windows and doors are not usually deducted.Including <br /> • Do not stack on top of corners them will provide an allowance factor for waste.If the <br /> • Store corners on level surface windows and doors are extremely large (such as a garage <br /> • Store out of direct sunlight or sliding glass doors), some deductions can be made <br /> • Keep corners In pack until installed. <br /> ■ To estimate the amount of starter strip required, <br /> WALL PREPARATION measure the linear feet around the entire base of the <br /> Celect siding is a rain screen but not intended to be a house. <br /> water resistive barrier.Therefore, Celect siding must be • Add siding to all material estimates to allow for waste, <br /> installed over a continuous water-resistive barrier with depending on the pitch of the roof and other house <br /> properly integrated flashing, specific factors. <br /> Celect must be applied over rigid sheathing that provides a is Every 100 square feet(9.29 square meters)s called a <br /> smooth flat surface. Never install Celect siding directly to "square"for ordering purposes. <br /> open framing/studs. Celect must be installed over either <br /> solid nailable sheathing, rigid sheathing with minimum 1X6 <br /> furring strips or rigid sheathing and elongating the nailing <br /> slots(page 22). <br /> Re-siding <br /> It may not be necessary to remove existing siding providing /—\\ <br /> all loose boards are re-secured and any rotten boards are <br /> replaced. Install furring strips or wall leveling siding <br /> underlayment to create a flat surface for the siding. Follow height n Eel <br /> all other details outlined above. <br /> r � <br /> width <br /> KEY RULES � <br /> • Nail in the center of the nailing slot unless pinning Is I)FlllliflIIii l li I1 N i` itih tiIt !, t II- 11► l'1���11N <br /> necessary. 11 141[�4�1`it, .� tP1llllt��`i� `i �1 <br /> • Fasteners must be placed in the center of the nailing Horizontal Siding and Shingles <br /> slots at approximately 16"spacing leaving about 1/32" Height feet(meters)x width_feet(meters) = square <br /> between the head of the fastener and the nailing hem feet(square meters) <br /> of the panel. Celect panels expand and contract <br /> through temperature changes. Vertical Siding(Pieces of vertical siding) <br /> • Never face nail the panels. Number of panels at_inches(mm)wide and 10 feet long <br /> width_feet(meters) _inches(mm) <br /> 12 13 <br />