My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ben and Carrie Modlin vs. Historic Preservation Commission (COA#2019-1007A)
sbend
>
Public
>
Common Council
>
Legislation
>
Upcoming Bills
>
2020
>
03-09-2020
>
Ben and Carrie Modlin vs. Historic Preservation Commission (COA#2019-1007A)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 10:43:36 AM
Creation date
3/2/2020 10:33:46 AM
Metadata
Fields
Template:
City Council - City Clerk
City Counci - Date
3/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INSTALLING PANELS <br /> Min. '/4"gap • Panels install left to right. <br /> . • • Install the first panel locking it down onto the <br /> starter strip and keeping the left end of the panel <br /> 3/8" away from the furring strip. <br /> '� • Fasten the panels by placing fasteners in the <br /> nailing flange; one in the center of the panel and <br /> 1 two on either side, evenly placed. Keep fasteners <br /> • approximately 2" in from both ends. (Fig. 6). <br /> i 1I <br /> �p. <br /> ., 3/8" Gap <br /> Min. ' " coverage Fig 5. i 5 fasteners per full panel <br /> I 1 <br /> INSIDE CORNER POSTS <br /> Inside corner posts are the only finish "trim" piece to <br /> be installed prior to the Fig. 6 47 <br /> siding panels. -,Y/Vr J <br /> • Install any inside • Install the remainder of the course overlapping <br /> corners. Fasten the the seams and leaving the necessary space <br /> inside corners using Y between the shakes. If the temperature is above <br /> weather resistant 70°F leave 1/8", if the temperature is below 70°F <br /> screws placed inside Install inside corners leave 1/4" (Fig. 8) <br /> the pocket of the prior to siding / <br /> corner no more than - 1/8" Gap above 70°F <br /> 16" apart. Unlike the 1/4" Gap Below 70°F <br /> other finished trim, y- <br /> inside corners areY7- y <br /> applied before th ,C Fig. 5 N , <br /> siding. <br /> NOTE: Make sure not to <br /> draw the pocket in when fastening to the wall. <br /> The pocket width must remain 3/4". Use a scrap <br /> piece of siding as a spacer in the pocket. The + _ <br /> inside of the corner post should not lay against the 1 <br /> siding. . ' -L- '' Fig.. 10 - <br /> 40 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.