My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Dubail Ave. Streetscape Engineering Services - VS Engineering, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Dubail Ave. Streetscape Engineering Services - VS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:24:56 AM
Creation date
2/26/2020 11:46:22 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project: Dubail Ave. Streetscape (Michigan Ave. to Miami Ave.) - City of South Bend, St. Joseph County, IN <br />Project Number: 120-009 <br />MANHOURS AND FEE JUSTIFICATION <br />DUBAIL AVE. STREETSCAPE DESIGN SERVICES <br />DESCRIPTION <br />Project <br />Engineer <br />Engineer I <br />CADD <br />Project <br />Surveyor <br />Party <br />Survey <br />Lump <br />TOTAL <br />Manager I <br />III <br />Tech. II <br />Chief <br />Tech II <br />Sum <br />HOURS <br />Project Administration & <br />Coorination Meetin 5 <br />Attend Project Review Meetings <br />20 <br />20 <br />40 <br />Open House/Public Meeting <br />10 <br />10 <br />12 <br />32 <br />General Project Administration <br />40 <br />8 <br />48 <br />Schematic Design Phase <br />Schematic Design (3 alternatives) <br />2 <br />6 <br />4 <br />16 <br />28 <br />Prepare Schematic Design <br />2 <br />6 <br />6 <br />32 <br />46 <br />Drawings <br />Preliminary Recommendations <br />2 <br />4 <br />6 <br />12 <br />30% Design Phase <br />Topographic Survey <br />8 <br />12 <br />31 <br />110 <br />229 <br />390 <br />ADA Compliance Field Check <br />12 <br />12 <br />4 <br />28 <br />30% Drainage/Green <br />4 <br />24 <br />24 <br />40 <br />92 <br />Infrastructure Design <br />30% Design Plans <br />6 <br />36 <br />60 <br />90 <br />192 <br />Quantity Calculations and <br />2 <br />12 <br />12 <br />2 <br />1 <br />28 <br />Prelimina Cost Estimate <br />QA/QC 30% Design <br />6 <br />6 <br />12 <br />60% Design Phase <br />60% Drainage/Green <br />Infrastructure Design <br />2 <br />12 <br />12 <br />18 <br />44 <br />60% Design Plans <br />6 <br />36 <br />36 <br />50 <br />128 <br />Maintenance of Traffic Plans <br />4 <br />12 <br />24 <br />16 <br />56 <br />Erosion Control Plans <br />2 <br />12 <br />16 <br />32 <br />62 <br />Preliminary Contract Documents <br />12 <br />40 <br />24 <br />76 <br />Quantity Calculations and <br />2 <br />12 <br />12 <br />2 <br />28 <br />Preliminary Cost Estimate <br />Utility Verification/Coordination <br />8 <br />24 <br />24 <br />8 <br />64 <br />QA/QC 60% Design <br />8 <br />8 <br />16 <br />90% Design Phase <br />
The URL can be used to link to this page
Your browser does not support the video tag.