Laserfiche WebLink
8. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />9. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised quantities calculations and opinion of probable Construction Cost, and assist Owner <br />in collating the various cost categories which comprise Total Project Costs. <br />10. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />30% PrefiminM Design Submittal <br />60% Prelimirlary Design Submittal <br />901%, Preliminal Desi{m,n Submittal <br />11. Furnish one 1 electronic (00 review copies of the Preliminary Design Phase documents <br />and any other deliverables to Owner within 60 calendar days of authorization to proceed <br />with this phase, and review them with Owner. Within 30 calendar days of receipt, Owner <br />shall submit to Engineer any comments regarding the Preliminary Design Phase documents <br />and any other deliverables. <br />12. Revise the 30% Preliminary Design Phase documents and any other deliverables in <br />response to Owner's comments, as appropriate. The 60% Preliminary Deisn Phase will <br />include maintenance of traffic plans, and erosion control plans. Furnish to Owner one 1 <br />lecrouuic ' copies of the 60% Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost, and any other deliverables within 60 calendar days after receipt <br />of Owner's comments. <br />13. Revise the 60% Preliminary Design Phase documents and any other deliverables in <br />response to Owner's comments, as appropriate, and fiunish to Owner one 1 electronic. <br />�d � copies of the 90% Preliminary Design Phase documents, revised opinion of probable <br />Construction Cost, and any other deliverables within 45 calendar days after receipt of <br />Owner's comments. <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the 90% Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />A1.03 Final Design Phase <br />A. After acceptance by Owner of the 90% Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner -directed modifications or changes in the scope, extent, character, <br />or design requirements of or for the Project, and upon written authorization from Owner, Engineer <br />shall: <br />1. Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />