Laserfiche WebLink
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Gemini at Colfax Apts. EXTERIOR RENOVATIONS <br />1 19-103 <br />February,W, 2020 <br />Bokon Masonry Inc. <br />BASE BID — Division A <br />Item Description Quantity Unit Unit Price Total Amount <br />No. _......... <br />1 Division A: Roof remove and 1 LS <br />P .........._.ent. re lacem _._.. . <br />2 Division A: Deck repair 100 SF <br />BASE BID TOTAL <br />BASE BID — Division B <br />......... ...... _ ..�......... <br />Item .... „� Amount <br />. ,. <br />No. Description Quantity Unit Unit Price Total <br />. .........ion B: Masonry Parapet Rebuild <br />1 section 1 (see drawing page A2.4) — 1 LS $243,097.00 <br />rebuild parapet including finials & <br />pedestrian protections. <br />Division B: Masonry Wall Repair section <br />2 2 (see drawing page A2.4) — repair 1 LS $175,045.0cl <br />indicated wall areas including at two <br />_ removed fire stairs. <br />3 Division B: replace additional 5 SF _.... �1 6mSFmmmITmm ��� _......e_........_...� <br />Chicago Common' wall veneer brick 1151 .00 <br />BASE BID TOTAL $ 418 , 142 . 00 <br />BASE BID — Division C <br />Item <br />No. <br />Description Quantity Unit Unit Price TotalAmount <br />1 Division C Base Bid: replace 2 fire stairs 1 LS <br />on west side of building. <br />BASE BID TOTAL <br />BASE BID — Division D <br />_. .............. <br />Item Description Quantity Unit Unit Price Total Amount <br />No. .. �.._....._ <br />Division D Base Bid: New water service <br />1 from Washington St. to south building 1 LS <br />foundation wall. Landscape re air. <br />BASE BID TOTAL <br />(cont. next page) <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />