Laserfiche WebLink
120-1affill coils'. <br />XVII. RETAINAGE AND FINAL PAYMENT <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 109 <br />B. Additions: <br />1. Payments will be made every thirty (30) calendar days. Contractor is required to submit <br />the completed "AIA Document G702TM - 1992" form to the City of South Bend Board of <br />Public Works along with electronic certified payrolls for the billed time period. <br />2 <br />e <br />per e'n-of'-pa &4 r-Gug out- e ufat �the.-p'm eot, Invoices shall be billed <br />monthly or as agreed upon between the Owner and Contractor. Given the nature of this <br />contract as a hauling contract. No retainage shall be held on invoices. Invoices shall be <br />paid in full unless there is a discrepancy between the Owner's Records and Contractor's <br />claims for payment. <br />Before final payment and-f--et i is released, the Contractor must satisfy the <br />following: <br />a. All trucking performed shall meet the requirements stated in the specifications. <br />b. Provide copies of trucking delivery trip tickets for all materials transported. <br />c. PFevid As Bt A dFavAngis he GRY of-Soutt <br />sp,eGikatilio WoFks. <br />d. One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final <br />Waiver of Lien. <br />XVIII. WARRANTY — NOT APPLICABLE <br />11MIT MM <br />" e: <br />rr► Taira <br />r�araa�srM�r r <br />Version 1 /30/2020 Special Provisions - 7 <br />