Laserfiche WebLink
South Bend edevelopment Commission <br />Regular Mee ing - December 21, 1979 <br />6. NEW <br />e. (continued ... <br />Mr. Johnson: Obviously a mistake has been made. <br />It ould mean two things; l) it was missed in <br />ins ection, or; 2) the contractor didn't fulfill <br />his obligation to through and inspect each and <br />every item. <br />Mr. Ellison: The result then is that we have a <br />contractor, who has an obligation to perform an <br />inspection at every house, but who did not, and <br />the efore, did not recognize this situation. Because <br />he Jid not do his job we then have a beneficiary <br />whol will suffer. <br />1 Robinson: Since they didn't have to put in a <br />tub, where is the original change order or <br />del tion? <br />Mr. Johnson: That was done by a previous change <br />ord r. This would be for the general contractor, <br />and the deletion of the tub would be for plumbing. <br />Mr. Robinson made a motion to approve Change Order <br />No. 8, with Plaia Construction Company, increasing <br />con ract price by $303.00,.for replacement of <br />bathroom walls (tile /plastic), at the address of <br />513 North Arthur, seconded by Mr. Cira, and the <br />mot on was unanimously carried. <br />f. Co <br />fission approval requested for Change Order No. <br />CHANGE ORDER #2 <br />2, idth <br />Charles Brown A1a.intenance Com Inc. for <br />WITH CHARLES BROWN <br />no <br />,ppy, <br />change in t e contract price, at the address of <br />MAINTENANCE CO., INC. <br />202 <br />West Sample Street, as set forth'in letter from <br />APPROVED (NO CHANGE <br />Mr. <br />James Johnson, Project Director; Bureau of <br />IN CONTRACT PRICE) <br />Hous <br />in g. <br />Mr. <br />Johnson: The initial inspection for 2021 W. <br />S <br />le dated 5/23/79 called for the installation <br />of <br />m interior door to the southwest room, and a <br />(13 ) <br />.foot base cabinet. The homeowner no longer <br />uses <br />the southwest room as a bedroom, does not want <br />a new <br />base cabinet because it will not match the <br />rest <br />of her cabinets, and the plastic tile on the <br />kitchen <br />wall is beginning to fall. Therefore, a <br />change <br />order is requested to repair and paint <br />all <br />existing cabinets and doors and install marlite <br />four <br />feet high on the kitchen walls for no change <br />in contract <br />price. <br />-12- <br />