My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/1902 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1902
>
06/1902 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:31:24 PM
Creation date
2/13/2020 2:31:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/1/1902
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1902. <br />Petition rece %ed for, -the, ope-ninq of South Me4. in, street :from Indiana ,to Ewing. <br />Avenue, and <br />to maintain the, width <br />of Main street <br />for the <br />entire distance,• , Same .Will .be , <br />re ferre-d to <br />the Common -Council for <br />authority to <br />proceed <br />at once .; <br />.Bid <br />of W. <br />Krill :for the <br />supplying of,gravel <br />for boulevards.about ,Le.eper Paz�n <br />accepted. One <br />and <br />one half yards <br />per load. at <br />�1.10 <br />Contracts <br />for the LaSalle Avenue <br />and <br />Frances <br />street and <br />Notre Dame <br />street <br />improvements, under <br />Improvement Resolutions <br />69, <br />70 and <br />71 -awarded <br />to Robert, <br />Hoban and <br />Roach. <br />Clerk instructed to notify the Urand Trunk Western Ry. Co. to put Division <br />street in order by use of gravel between Chapin and Laurel streets . <br />Resolved by the Board that it is desirable to avoid the construction of a pile <br />bridge by the Indiana Ry. Co, a-!ross the St. Joseph river at the foot of Michigan street, <br />and that this board will approve of a plan whereby, without cost to the City, said Ind <br />Jana Ry. Coo -can construct a third truss in connection with the Leeper bridge, without <br />interfering with the present roa;gray or width of sidewalks of said bridge. <br />Petition filed for sidewalks and curbs for Miner street from St. Louis to St. <br />Peter street. <br />Ten year <br />guarantee <br />bond of <br />James Nelson for the Laurel street brick pavement, <br />under Improvement <br />Resolution <br />No. 43, <br />filed. <br />Engineer requested to draw up a plan for the 2ranklin street sewer. <br />Engineer reported the cost of the City` s share for the paving of Division street <br />with brick from Chapin to Olive streets as follows: <br />3310 sq • yds . @ $1.40 for intersections 4634.00 <br />1125 feet 12 inch water main ® 81.60 $1800.00 <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.