My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/1902 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1902
>
05/1902 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:30:10 PM
Creation date
2/13/2020 2:18:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/1/1902
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 13, -902. 7215 P. M. <br />The Board again took -up --the assessment roll and final estimate hearing on the <br />Wenger street curb, under Improvement Resolution No. 41 such hearing being postponed <br />hearing of December 30th 1901. A committee of property owners appeared before the Board <br />and again remonstrated against the acceptance of the final -estimate and the confirmation <br />of the assessment roll The City Engineer reported that the work had not yet been put 'in <br />a satisfactory condition and had received no substantial changes since the Boardlast in- <br />spected it. The Board accordingly find that the confirmation of this assessment roll and <br />final estimate should be postponed until Tuesday July ist 1902 at 7:15 P. M The board <br />find that if the work is not satisfactory to the Board and Engineer on that date it will <br />be necessary for the board to readvertise for bids and do the work again. <br />Bearing upon the following street improvements: The grading of Eddy and Mish- <br />awaka, streets,, the Harrison Avenue. -Van Buren street, Dayton street and Fellowsstreet <br />improvements, under Improvement .Resolutions Nos. 62, '63) 640 65, and 66 respectively. In <br />regard to Improvement Resolution No. 62, at tl e suggestion of property owners at the hear- <br />ing, the board decided to add cement curbing and the engineer having presented specifi- <br />cations for such curbing at the time this resolution was adopted the board accordingly <br />do hereby incorporate the construction of cement curbing into this improvement resolution; <br />no remonstrators having appeared said improvement resolution No. G2 is accordingly con- <br />firmed. The engineer filed the estimated cost of such improvement, including the cement <br />curbs, at 4300.00 In regard to -the improvements represented by resolutions 03, 64t 65 <br />and 66 no remonstrators appeaud and no remonstrances were filed. The engineer riled the <br />estimated costs as follows: For Harrison Avenue �'511.40 For Van Buren street 1972.00 <br />''or Dayton street 2550.00 Far Fellows street 250.00 In all of the above cases <br />including Improvement Resolution No. 62 as ruodi f ie d the board find that the benefits, <br />including -the benefits to the city,, are in each case equal to the estimated cost of the <br />respective improvements. <br />President. --"�, <br />
The URL can be used to link to this page
Your browser does not support the video tag.