Laserfiche WebLink
Contracts signed with Le H. Webster for the construction of the E. Colfax <br />Avenue sewer connections and the South Laurel street sewer connections. Also with James <br />Aslin for the Wayne street eater connections and with James Nelson for the Wayne street <br />sewer connections. Also with William Draper for the E. Colfax Avenue water connections. <br />Contracts provide for completion of the work by April 15th and for the tamping of the <br />trenches from bottom to top. <br />Petition filed for cement walks and curbs on Burroughs street from Michigan <br />Avenue to Marion street, also for grading said Burroughs street if necessary. <br />President. <br />