Laserfiche WebLink
23 <br />January 17, . 1902. <br />Engineer. reported estimated cost of paving La Salle Avenue- with brick from <br />Taylor street to Laporte Avenue $ 1058.40 <br />Contract signed with the Terre Haute and Logansport Ry. for the construction <br />of the Elmira street viaduct. <br />President. <br />