My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/1901 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1901
>
07/1901 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:32:26 PM
Creation date
2/13/2020 10:51:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/1/1901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 30.1901 7.15 P. 1A. <br />First hearing on Improvement Resolution No. 42 for construction of cement curbs <br />on.Ford.street. No remonstrators appeared. The Engineer filed the estimated.cost 0555.60 <br />The Board find the benefits, including the benefits to the City, are equal to the estim4t- <br />ed cost of, the improvement. Improvement Resolution No. 42 is hereby confirmed. <br />First hearing on Improvement Resolution No.40 for the construction of.cement <br />curb and cobblestone gutters on Hill street. No remonstrators appeared.�The Engineer filed <br />the estimated cost.. 170.36 The Board.find that the benefits, including the benefits to <br />the City, are equal to the 'estimated cost of the improvement. Improvement Resolution No.,40 <br />40 is hereby confirmed. <br />First hearing on Improvement Resolution No.41 for cement curbing on Wenger stye - <br />et. No remonstrators appeared. The Engineer filed the estimated cost$658.60 The Board find <br />that,the benefits, including to benefits to the City, are equal to the estimated cost of <br />the improvement. Improvrment Resolution No. 41 is hereby confirmed. <br />First hearing on Improvement Resolution No. 39 for the construction of a pipe s <br />sewer on East Washington -,street. No remonstrators appeared. The <br />Engineer filed <br />the <br />estim- <br />ated cost $2795.84 The Board find that the benefits, including <br />the benefits to <br />the <br />City, <br />are equal to the estimated cost of the improvement. Improvement 'Resolution No•39 is hereby <br />confirmed. <br />First hearing on Improvement Resolution No. 38 for a pipe sewer on East Colfax <br />Avenue. No remonstratirs appeared. The Engineer filed the estimated cost $1319.20 The <br />Board find that the benefits, including the benefits to the City, are equal to the estim- <br />ated cost of the improvement. Improvement Resolution No.38 are hereby confirmed. <br />Hearing as to the amount of assessments and upon the final estimate for the imp- <br />t of "B" street by the �const ruction of cement curb, walk anf grading. No remonstr- <br />appeared. The assessment roll, filed July 22, 1901, and the final estimate, allowed <br />2, 1901, are hereby confirmed. <br />Hearing as to the amount of assessmen�s and upon the final estimate far the imp- <br />rovement of Edward street by the construction of cement curb and grading. No remonstrators <br />appeared. The assessment roll, filed July 22, 1901m, and the final estimate allow-d July 22 <br />1901, are hereby confirmed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.