Laserfiche WebLink
27 <br />APRIL 16. 1901. <br />Street commissioner instructed to cooperate wieh the Township Trustee to repair <br />the culvert on Olive street and to incur necessary expenditure on the part of the city. <br />Engineer instructed to prepare postal cards for the accommodation of property <br />owners statinz that they will be required to specify the location of sewer and water taps <br />also stating that if the engineer is.not advised as to such locations the same will be <br />made where the board deem best. <br />Barber Asphalt Company authorized to begin work on north Taylor street from <br />west Washington street to Colfax Avenue. <br />Property owners on the west side of Hydraulic Avenue notified to place in repair <br />the sidewalk whic'= overhangs the east race. <br />Petition of property owners for the construction ofeement sidewalks and cement <br />curbs on both sides of Frances street from east Jefferson street to the Saint Joseph <br />River referred to the engineer for specifications *Engineer also instructed to prepare <br />specifications for same on Frances street from east Jefferson street to the south line of <br />east Water street. <br />re ruse d. <br />Petition for an .eclectric light on the corner of Main and Monroe streets refused. <br />Petition for an electric light at corner of Midway street and Prairie Avenue also <br />Petition of J.L.Reddick of Hiles Michigan for rebate on account of surer tap on <br />Lot 89 Fowlers Addition to South Bend referred to engineer for advice. <br />APRIL I6,I90I. 7:I5 P.M. <br />First hearing on the Clinton street pipe sewer improvement -No remonstrance. <br />Engineer filed the estimated cost $ 1946.25 The board find that the benefits, including <br />the benefits to the city are equal to the estimated cost of the improvement. <br />Declaratory resolution for this improvement confirmed. <br />