My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Engineering Services for Lincoln Way West and Olive Street Intersection - Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Engineering Services for Lincoln Way West and Olive Street Intersection - Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:26:10 AM
Creation date
2/12/2020 10:29:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Limitation ql t?sponsibilrties: Engineer shall not be responsible for the acts or oniissions of ally <br />Contractor, Subcontractor of Supplier, or other iladivlduals or entitles perfoniiing or furnishing any <br />of the Work, for Safety Or security at the Site, or for safety precautions and larograms incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />A1.06 Post -Construction Phase <br />A. Upon written authorization from Ownerduring the Post -Construction Phase Engineer shall: <br />Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with. Contractor concerning correction of any such <br />de -sects, and inaike reconiniendations as to replaceinent or correction of defective Work, if <br />any. <br />2. Together with Owner or Owner's representative, visit the Project within one month before <br />the end of the correction period to ascertain whether any portion of the Work is subject to <br />correction. <br />3. Perform or provide the following additional Post -Construction Phase tasks or deliverables: <br />None <br />B. The Post -Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate twelve months after the commencement of the <br />Construction Contract's correction period. <br />PART 2 — ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner's Written Authorization <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />1. Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with <br />the Project; preparation or review of environmental assessments and impact statements; <br />review and evaluation of the effects on the design requirements for the Project of any such <br />statements and documents prepared by others; and assistance in obtaining approvals of <br />authorities having jurisdiction over the anticipated environmental impact of the Project. <br />2. Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others. <br />3. Services resulting from significant changes in the scope, extent, or character of the portions <br />of the Project designed or specified by En pincer or its design requirements including, but <br />not litnited to, changes in size, cornplexity, Owner's schedule, character of construction, or <br />method of finatncing; and revising previously accepted studies, reports, Drawings, <br />Page 8 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.