My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Wastewater Treatment Plant Secondary and Disinfection Improvements – Proj No. 119-069 - Thieneman Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Wastewater Treatment Plant Secondary and Disinfection Improvements – Proj No. 119-069 - Thieneman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 4:35:41 PM
Creation date
2/12/2020 10:24:37 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND"' <br />Project Name: WWTP Secondary and Disinfection Improvements <br />Project Number: 119-069 <br />.�- — <br />For Bids Due:danmafy4Februa ry11 220 <br />.....� <br />...�..........�.._......_............ <br />Contractor Name: Thieneman Construction, Inc. <br />BASE <br />BID <br />.......... <br />Item <br />No. <br />Description <br />_.._............. <br />Quantity <br />_ <br />Unit <br />__ ....... <br />Unit Price <br />...... <br />Total Amount <br />1 <br />General Construction <br />4-� <br />la <br />...... <br />Final Clarifier Nos. 1, 2 and 3 <br />General Construction,�/�✓ <br />1 <br />__........ - <br />LS <br />!� <br />1b <br />Final Clarifier Nos. 4 and 5 <br />General Construction <br />1 <br />LS <br />�(j <br />4,100000 <br />1c <br />Chlorination/Dechlorination <br />General Construction <br />1 <br />LS <br />vek oxvU� <br />, <br />I <br />Aeration Tank General <br />Construction <br />........... <br />1 <br />LS <br />ou <br />000 <br />2 <br />Spall Repair <br />400 <br />SF <br />000 <br />3 <br />Crack Repair <br />300 <br />_...... <br />LF <br />(� <br />_ <br />4 <br />Expansion Joint Repair <br />200 <br />LF <br />'' <br />1 0 C) <br />5 <br />Slab Repair <br />200 <br />SF <br />_ _.. <br />6 <br />Railing Removal and Replacement <br />2400 <br />LF <br />-s 000 <br />7 <br />Protective Slurry <br />50,000 <br />SF <br />Co 00 0 <br />8 <br />Chlorination/Dechlorination Building <br />500 <br />SF <br />2 Q <br />3 <br />i �f <br />Gratin <br />0oc) <br />BASE BID TOTAL <br />13 t'"),P 1e) <br />ALTERNATIVE #1 <br />Item <br />Description <br />No. <br />Quantit Unit Unit Price <br />Total Amount <br />9 Alternative 1 — Metal Effluent Launders <br />1 LS <br />ALTERNATIVE #1 TOTAL <br />V <br />ALTERNATIVE #2 <br /><a4l <br />Item Description <br />No. <br />Quantity Unit Unit Price <br />Total Amount <br />10 Alternative 2 Aeration Tank Work <br />1 aim <br />LS <br />mmmmm <br />� w ^^^^ITIT <br />ALTERNATIVE #2 TOTAL <br />............ . <br />. 0zil) zilA <br />03029045.0000 0041 13-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.