My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Wastewater Treatment Plant Secondary and Disinfection Improvements – Proj No. 119-069 - Superior Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Wastewater Treatment Plant Secondary and Disinfection Improvements – Proj No. 119-069 - Superior Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 4:33:37 PM
Creation date
2/12/2020 10:21:49 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13:t';;i:fr-('.,vti,N I:u.v�, 5'41235-9251 <br />_.r. VV . I.r . _BM11 FVARC, a 574123 i-9171 <br />S.r:riiR,ND. limm 41601-1NI' 574/235-5507 <br />Y� w. <br />!h'fil w <br />CITY OF Sou rl I Bi ND Pt':I'E BUT 1"rl(i11 G, MAYOR <br />Date: JaMjary 23 �020 <br />�. .......... ............ ...... ...... <br />To: All Planholders <br />from Linda M. Martin, Clerk, hoard of Public Works <br />Subject ... ........_..... _ ®n... .. ............... <br />Addendum Number: 1 <br />Project Name. WWTP — Sec ondary and Disinfection Improvements <br />Project No.: 119-069 <br />ACKNOWLEDGEMENT OF RECTIP"T OF ADDENDUM <br />Date Received: January 23, 2020 <br />This addendum is being forwarded to you for the above referenced project. <br />Please sign below and acknowledge receipt of this Addendum <br />by faxing this sheet to the Board of Public Works at (574) 235-9171 <br />within 48 hours of receipt. A copy 11 l jl ),ST also be included with your <br />bid package upon submittal. <br />THIS ADDENDUM MAY AFFECT YOUR BID. <br />Notes <br />The attached documents are hereby added to the Specifications and Contract <br />Documents and become a part of herein. <br />Company: Superior ConstructionCo.,mInc. <br />Authorized Signature: � ,. f)aI)iel j. Sop za k, President <br />Date: January 23, 2020 ............. � . <br />
The URL can be used to link to this page
Your browser does not support the video tag.