My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Main Street Culvert Inlet Proj No. 120-016 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Award Quotations/Proposals
>
Award Quote - Main Street Culvert Inlet Proj No. 120-016 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:50:02 AM
Creation date
1/29/2020 10:46:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rotIi11 ` <br />186 <br />PROJECT NAME: Main Street Culvert Inlet <br />PROJECT NO. 120-016 <br />QUOTES DUE January 14, 2020,mmm9:30 a.m., Local Tim <br />e <br />(Must be completed for all quotes. Please type or print) <br />Date: 1/14/2020 Firm: Selge Construction Co., Inc. <br />2833 S. 11 th Street..�-.._. W.......�..._ ......�...... ................�_ <br />Address: <br />Y 20 <br />City/State/Zip: /State/Zip Niles, MI 491 Telephone Number: 269 _ 684-0842 www mmmm <br />Agent of Bidder (if Applicable): Pursuant to notices given, the und__ersigned offers to furnish labor andbr public works project of: material necessary to comp- <br />lete the <br />Main Street Culvert Inlet <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of�South Bend Department of Public Works <br />and dated January 2020 ] for the sum of (enter the Total Quote as shown on the Proposal) <br />Twelve Thousand Five Hundred Dollars & Zero Cents _�$12,500.00 <br />(Enter Sum of Total Quote shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />By <br />(Signature) <br />P noted a e of Peron ..... <br />_.. <br />son Signing) <br />ACCEPTANCE <br />The above quote is accepted this day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC <br />Gary I ot, Presidt <br />Ei z et h AIV—Iradik, <br />T�rese J D ra i, m'f <br />20 ,.( <br />Version 4/2/2019 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.