Laserfiche WebLink
• Includes all applicable permits for this wok with St. Joseph County/City of South Bend. <br />• Includes a new warranty on the boiler package. <br />Additional system modifications included to improve system performance and longevity: <br />• Pipe in low -point drains at a few locations on the basement condensate piping, temporarily connect city <br />water to the system and flush the entire lower level condensate main of sediment and debris. <br />• Replace the check valves on the boiler feed piping so that we can ensure they are new and operational. <br />• Furnish and install one (1) Peerless Model 30FME water softener for the make-up water feed to the boiler <br />feed tank. <br />o Includes six (6) bags of salt for the initial fill of the tank and a few extras. <br />• Furnish and install one (1) chemical feed pump with 15-gallon drum of treatment chemicals and initial <br />chemical treatment set-up and service. <br />o We have included the initial chemical feed pump, chemicals and set-up. After the initial set-up, <br />our recommended chemical treatment contractor, Zinkan Chemical, can contract directly with <br />you to perform monthly check-ups and any required chemicals (about $100 per service call plus <br />chemicals). This would only be needed during the heating season while the boiler is in use. <br />o Includes applicable wiring and relays to interlock the chemical feed pump to the boiler feed unit <br />so that treatment chemicals are introduced to the system whenever make-up water is <br />introduced. <br />All work includes: <br />Owner training on the proper operation of the system including explanation of boiler operation, chemical <br />treatment and necessary condensate/boiler feed water blowdowns to remove sediment. <br />All applicable permits for this wok with St. Joseph County/City of South Bend. <br />A one (1) year warranty on all Edward J. White, Inc. furnished and installed material and equipment <br />associated with this project. <br />o The new boiler comes with a one (1) year parts warranty and ten (10) year warranty on the cast <br />iron sections. A copy of the manufacturer's warranty statement is attached to this quotation. <br />We will perform this work for the sum of Fifty Thousand Two Hundred Nineteen and 00/100 Dollars ($50,219.00). <br />Does not include sales tax. A copy of your tax exemption certificate must be on file prior to starting the project. <br />All work performed Monday through Friday between the hours of 7 AM and 3:30 PM EST. Pricing is based on the <br />assumption that the existing freight elevator is operational and can be used to move the old and new sections in <br />and out of the building. <br />The new boiler has a lead time of approximately one (1) week from date of order. If you decide to proceed with <br />this work, please notify our office ASAP so that we can get everything coming. <br />Please contact our office with any questions. <br />Respectfully submitted; <br />Edward J. White, Inc. <br />Jeffrey M. Bucher, Jr. <br />Vice -President <br />°'� f`?" <br />