My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Emergency Quote – Ratify Emergency Replacement of Boiler for Weather Amnesty Building - Edward J. White, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Emergency Quote – Ratify Emergency Replacement of Boiler for Weather Amnesty Building - Edward J. White, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:57:12 AM
Creation date
1/15/2020 9:49:27 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Requests
Document Date
1/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rEIR B011 EIRS <br />J I u 1,121; <br />Alternative Piping -for LGBTM-4 through 12 only: <br />If desired, all three piping connections (supply, <br />return and expansion tank) can be taken off <br />same end of boiler. <br />Supply and return sizes in table below for water <br />boilers refer to minimum size of pipe connected <br />to boiler for 20, or higher temperature drop <br />between supply and return. <br />�N AM B0IIII IIII III III° <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.