Laserfiche WebLink
To: Myron Cohagan <br />LOCHMUELLER GROUP <br />130 SOUTH MAIN ST., STE 300 <br />SOUTH BEND, IN 46601 <br />Ph: (574)334-5488 <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph : 219-362-2127 <br />Change Request <br />Number: 173 <br />Date: 12/12/19 <br />Job: 56-445 SOUTH BEND,CTY HOWARD P-RDVLP <br />Phone: <br />Description: Partial Cafe Buildout w/HVAC & SOG for Finishing by Others <br />We are pleased to offer the following specifications and pricing to make the following changes <br />All labor, material and equipment to furnish and install the cafe underslab work for the Cafe on T&M including relocating the electrical <br />panels rough in for the revised flooring layout. Pour and finish the concrete floors. Furnish only doors and hardware for two restroom <br />and two kitchen impact doors. Furnish and set RTU unit complete with minimal ductwork and controls just to keep the space warm <br />and avoid freezing. Permanent electrical panels furnished and installed is included. Roofing modifications for roof penetrations is <br />included. Cafe tenant to locate and coordinate hood location for opening. <br />Description <br />Labor <br />Material Equipment <br />Subcontract <br />Other <br />Price <br />Pemberton Davis Cost Moving LP3 & LP4 <br />$3,280.00 <br />$3,280.00 <br />Pemberton Davis Under Slab R1 Cost <br />$21,511.00 <br />$21,511.00 <br />Pemberton Davis Connect RTU Costs <br />$5,539.00 <br />$5,539.00 <br />DA Dodd HVAC & Plumbing Cost <br />$112,099.00 <br />$112,099,00 <br />WIW Cost Furnish & Install Roof Frames <br />$7,723.00 <br />$7,723.00 <br />Dudeck Roofing Costs <br />$18,500.00 <br />$18,500.00 <br />Lazzaro Door, Frames Hardware Material Cost <br />$5,993.00 <br />$5,993.00 <br />LID General Conditions <br />$9,478,00 <br />$1,698.00 <br />$11,176,00 <br />LID Temp Doors <br />$324.00 <br />$324.00 <br />Temp Heater <br />$1,050.00 <br />$1,050.00 <br />4" Conc Floors PUMPED, WWF, Wet Cured, <br />$5,826.00 <br />$11,699.00 <br />$2,057.00 <br />$19,582.00 <br />Vapor Barrier w/Fine Grading <br />Stone Veneer Below Garage Door Opening <br />$1,500,00 <br />$500.00 <br />$2,000.00 <br />Subtota[ <br />$208,777.00 <br />OH & P - Labor <br />$17,128.00 <br />20.00% <br />$3,425.60 <br />OH&P - Material <br />$18,192.00 <br />12.00% <br />$2,183.04 <br />OH&P - Equipment <br />$2,748.00 <br />12,00% <br />$329.76 <br />OH&P <br />- Subcontractor (First 3K) <br />$3,000.00 <br />10.00% <br />$300.00 <br />OH&P - Subcontractor (After 3K) <br />$167,709.00 <br />T00% <br />$11,739.63 <br />Bond Markup <br />$226,755.03 <br />1.00% <br />$2,267.55 <br />Total: <br />$229,022.58 <br />Page 1 of 2 <br />