Laserfiche WebLink
This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 12, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 3 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: June 12, 2018 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: Black & Veatch Corporation <br />d. Pro_ject: Hydraulic Modeling Training and Olive WTP Improvements Preliminary <br />Engineering <br />2. Description ofModifications: <br />Engineer shall perform or furnish the following Additional Services: <br />Task 4 — Olive WTP Improvements Design, Bid and Construction Phase Services <br />Engineer will provide bid phase services to assist the Owner and Contractor to <br />develop cost savings ideas and participate in the preconstruction conference for the <br />needed improvements to the sodium hypochlorite and fluoride storage and feed <br />systems as well ancillary systems at the Olive Water Treatment Plant to maintain a <br />high level of service and safe working environment during normal operation of the <br />treatment facility as documented in the Olive Water Treatment Plant Improvements <br />Preliminary Engineering Report. <br />Task 405 — Bid Phase Services <br />The Engineer will prepare one additional addendum for a total of two addenda to <br />the Construction Contract Documents for the Owner to distribute. The Engineer <br />will also coordinate with the Bidder and Owner to develop cost savings ideas for <br />incorporation into the project. The Engineer will participate in up to three <br />conference calls and one site visit with the Contractor and Owner to review each of <br />the cost savings ideas. Cost opinions for each of the cost saving items will be fully <br />developed by the Contractor and provided for review to the Engineer and Owner. <br />Task 412 — Preconstruction Meeting <br />At a date and time selected by the Owner and at the Owner's site in South Bend, <br />Engineer will participate in a preconstruction conference led by the Owner. The <br />Page 1 <br />(Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright (0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />