My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8573-95 Amending Article 2 Chapter 17 Municipal Code Pretreatment Requirements Public Sewers
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1995
>
8573-95 Amending Article 2 Chapter 17 Municipal Code Pretreatment Requirements Public Sewers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2012 4:02:53 PM
Creation date
9/21/2012 4:02:51 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
1/9/1995
Ord-Res Number
8573-95
Bill Number
127-94
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
per day, to the POTW from regulated process <br /> streams and other stream, as necessary, to allow <br /> use of the combined wastestream formula set out in <br /> 40 CFR 403. 6 (e) . <br /> e. Measurement of Pollutants . <br /> 1 . Identify the categorical <br /> pretreatment standards applicable to <br /> each regulated process . <br /> 2 . Submit the results of sampling and <br /> analysis identifying the nature and <br /> concentration (and/or mass, where <br /> required by the standard or by the <br /> Director) of regulated pollutants in the <br /> discharge from each regulated process . <br /> Instantaneous, daily maximum and long <br /> term average concentrations (or mass, <br /> where required) shall be reported. The <br /> sample shall be representative of daily <br /> operations and shall be analyzed in <br /> accordance with procedures set out <br /> herein. <br /> 3 . Sampling must be performed in <br /> accordance with procedures set out <br /> herein. <br /> f. Certification. A statement reviewed by <br /> the industrial user' s authorized representative <br /> and certified by a qualified professional, <br /> indicating whether pretreatment standards are <br /> being met on a consistent basis -- and, if not, <br /> whether additional operation and maintenance (O&M) <br /> and/or additional pretreatment is required to meet <br /> the pretreatment standards and requirements . <br /> g. Compliance Schedule. If additional <br /> pretreatment and/or O&M will be required to meet <br /> the pretreatment standard; the shortest schedule <br /> by which the industrial user will provide such <br /> additional pretreatment and/or O&M. The <br /> completion date in this schedule shall not be <br /> later than the compliance date established for the <br /> applicable pretreatment standard. A compliance <br /> schedule pursuant to this section must meet the <br /> requirements set out herein. <br /> h. All baseline monitoring reports must be <br /> signed and certified in accordance with Subsection <br /> 17-10 (i) (11) below. <br /> (3) Any permittee subject to a pretreatment standard <br /> set forth in this division shall submit to the Director, <br /> during the months of June and December, unless required <br /> more frequently by the discharge permit, a periodic <br /> compliance report on forms provided or prescribed by the <br /> Director indicating the nature and concentration of <br /> prohibited or regulated substances in the effluent . <br /> Included in the report shall be a record of all measured <br /> or estimated average and maximum daily flows during the <br /> reporting period, computed by verifiable techniques as <br /> required by the applicable discharge permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.