6. NEW BUSINESS (Cont'd
<br />i. han a Order No. 2 to Rehabilitaton Contract SECD /PR CS-2 13.1 in CHANGE
<br />,omrhuhity Develo ment'Housin Program: Commission approval was ORDER NO.2
<br />equested of Change Order No. 2 to Rehabilitation Contract SECD/ TO REHAB.
<br />R /CS -2/13, with the Fleming Masonry Construction Company, for CONTRACT
<br />n increase in contract amount of $58.00, (Contract: $5,785.00), SECD /PR /CS-
<br />r an amended contract total of $5,843.00, with contract time 2/13 APPROVED,
<br />nchanged, for rehabilitation work at: 408 East Keasey Street, CD HOUSING
<br />n the Community Development Housing Program. PROGRAM
<br />r. Crighton advised the specifications called for the installa-
<br />ion of a stainless steel sink and a 5` bathtub. While install -
<br />ng the plumbing items, the plumber found the main trunk line to
<br />he sewer clogged, and requested this change order to clean out
<br />he drain.
<br />r. Wiggins moved for the approval of Change Order No. 2 to
<br />ehabilitation"Contract SECD /PR /CS- 2/1`3, for an increase in
<br />ontract amount of $58.00, or an amended contract total of
<br />5,843.00, with Fleming Masonry Construction Company, in Com
<br />unity Development Housing Program. Motion was seconded by Mr.
<br />obinson and carried.
<br />j. Change Order No.'2 to Rehabilitation Contract SECD /PR CS =2/20, in CHANGE
<br />ommunit Development Housing Program: Commission approval was ORDER NO. 2
<br />equested of Change Order No. 2 to Rehabilitation Contract SECD / TO REHAB.
<br />FR/CS-2/20, with the Fleming Masonry Construction Company, for CONTRACT
<br />an increase in contract amount of $295.00, (Contract: $5,653.00), SECD /PR /CS-
<br />lr an amended contract total of $5,948.00, with contract time 2/20 APPROVED,
<br />nchanged, for rehabilitation work at: 310 East Dubail Street, CD HOUSING
<br />in the Community Development Housing Program. PROGRAM
<br />Mr. James L. Johnson, Jr., Chief Inspector, advised the speci-
<br />fications called for covering the entire structure with 3 -in -1
<br />seal-down asphalt shingles, and install metal edging, including
<br />porches. The basement entrance door was conformed. While in
<br />the process of inspecting the roof, they ran into a lack of
<br />s eathing on the rear porch - -70 square feet- -that should be
<br />r placed with new shingles. Also, the rear basement door since
<br />tie inspection has deteriorated, so we are asking the Commission
<br />f r a change order for the basement door, (exterior door, frame,
<br />j mb, threshold, lite or peephole, cylindrical lockset, weather-
<br />s ripping, and paint or stain and varnish two coats, using poly
<br />-
<br />u ethane varnish. Install an aluminum storm combination door),
<br />a d sheathing for the rear porch.
<br />C mmissioner Robinson asked if this is under our new policy or
<br />if it is still existing under our old policy, between inspection
<br />aid the actual beginning of work- -about a year or so? Mr. Crighton
<br />a vised it is under the new policy. Mr. Johnson added it was a
<br />r cent inspection.