6. NEW BUSINESS (Cont'd <br />trical subcontractor .concerning -an upcoming change order relating <br />to the contract. Per Mr. Richard E. Pfeifer's memorandum, (who is <br />Chief Inspector of the Northwest Bureau of Housing), if this time <br />extension is approved, the contractor states he can complete this <br />structure within the specified time limit. <br />Mr. Keith P. Crighton, Director, Bureau of Housing, added he had <br />no other comments, other than Slatile has been performing reason- <br />ably well, and that he is trying to be as flexible as possible <br />with his subcontractor. The subcontractor had jury duty for two <br />weeks this month and lost that time. One house is involved on <br />this contract. <br />Mr. Wiggins moved for the approval of Change Order No. 2 to Re- <br />habilitation Contract No. NWCD /03, with Slatile Roofing & Sheet <br />Metal, Inc., for an extension in contract time from May 21, 1976, <br />to June 30, 1976, with no change in contract amount, in the North- <br />west Community Development Program. Motion was seconded by Mr. <br />Donaldson. <br />Mr. Richard Pfeifer in his memorandum advised that the specifica- <br />tion called for the installation of 100 amp service with circuit <br />breakers. It was brought to his attention by the electrical con- <br />tractor that this structure already has 100 amp service that is <br />in good working order. However, the structure does not meet our <br />project specifications; i.e., insufficient plugs, lights, switches, <br />ground fault installations. This electrical work totals $690.00, <br />leaving a balance of $123.00 that was in the original specifica- <br />tion for the electrical system work in amount of $813.00. Staff <br />feels this balance should be applied to the insulation and enclos- <br />ing of the east wall in the utility room, and recommends the con- <br />tract be amended to include the items on the change order and it <br />be approved. The additions include 19 items amounting to: $813.00. <br />Motion was made by Mr. Robinson that we grant his request, seconded <br />by Mr. Wiggins and carried, for the approval of Change Order No. 3 <br />to Rehabilitation Contract No. NWCD /03, with Slatile Roofing & Sheet <br />Metal, Inc., with no changes in time or contract amount, in the <br />Northwest Community Development Program. <br />- 5 - <br />31 <br />Commissioner Robinson said he can't see why it would take six <br />weeks - -even if he would have to go and get a new electrical con- <br />tractor- -why he needs six weeks extension just to do electrical <br />work in a house. Commissioner Wiggins said he has already had <br />most of the extension time; he only has two weeks left. Motion <br />carried. <br />d. <br />Change Order No. 3 to Rehabilitation Contract No. NWCD /03, North- CHANGE <br />west Community Development Program: Commission approval was re- ORDER NO. <br />quested of this Change Order, with Slatile Roofing & Sheet Metal, TO REHAB. <br />Inc., which also relates to the above Contract item, for changes CONTRACT <br />in specification items with no changes in time or contract amount, NWCD /03 <br />for rehabilitation work at 506 LaPorte Avenue, in the Northwest APPROVED, <br />Community Development Program. NWCD PROG <br />Mr. Richard Pfeifer in his memorandum advised that the specifica- <br />tion called for the installation of 100 amp service with circuit <br />breakers. It was brought to his attention by the electrical con- <br />tractor that this structure already has 100 amp service that is <br />in good working order. However, the structure does not meet our <br />project specifications; i.e., insufficient plugs, lights, switches, <br />ground fault installations. This electrical work totals $690.00, <br />leaving a balance of $123.00 that was in the original specifica- <br />tion for the electrical system work in amount of $813.00. Staff <br />feels this balance should be applied to the insulation and enclos- <br />ing of the east wall in the utility room, and recommends the con- <br />tract be amended to include the items on the change order and it <br />be approved. The additions include 19 items amounting to: $813.00. <br />Motion was made by Mr. Robinson that we grant his request, seconded <br />by Mr. Wiggins and carried, for the approval of Change Order No. 3 <br />to Rehabilitation Contract No. NWCD /03, with Slatile Roofing & Sheet <br />Metal, Inc., with no changes in time or contract amount, in the <br />Northwest Community Development Program. <br />- 5 - <br />31 <br />