Laserfiche WebLink
4. COIMMUNICATIONS (Cont'd) <br />Motion was made by Mr. Wiggins that these letters be accepted <br />and placed on file. Motion was seconded by Mr. Donaldson and <br />unanimously carried. <br />b. The Hickey Company, Inc. letter dated January 15, 1976: Mr. <br />C. Blayne Brownell, Executive Director, read the contents of <br />this letter in its entirety, which is over the signature of <br />Mr. G. A. Hickey, Chairman of the Board: <br />In accordance with out convetvsation v6 January 15, <br />1976, we wiU extend out ptopoz al jot contract numbet <br />10, PaAts A and D dated November 18, 1975 untit Match <br />15, 1976 with no inctteaze in pt.ice. This eonttcact <br />totaled $750,298.00. <br />14 ,the 4oZtowing ,items ate deducted, the va2uez ate <br />as 4ottows : <br />1) Two pooa, chem.icaa and 5ump pump $46,650.00 <br />2) Benches - 16 unit's 21-923.00 <br />3) Substitute brown conetcete iot <br />te"azzo paving 1,900.00 <br />4) Bt ck paving in i6tand neat LaSalle Ave. 2,500.00 <br />5) B,ieycte tacks - 12 units 1,700.00 <br />6) Sound zyztem conduit 2,700.00 <br />7) Demotiti.on o4 vautt - SP 8A, including <br />eoncAete paving 1, 600.00 <br />TOTAL DEDUCTION 59,973.00 <br />THE HICKEY <br />CO., INC. <br />LETTER RE <br />EXTENSION <br />TO AWARD <br />CONTRACT 10, <br />MALL EXTENSION, <br />R-66 <br />In addition, we tequut that the completion date be adjusted <br />to eotvice�s pond with any delayed stat t ing date. <br />We tAurt thiz is the in4otmation you desitce, and took 4orwatcd <br />to wo& ing with you on thin ptoj ect. <br />Along with this item, Mr. Brownell asked to go on to the next <br />item on the Agenda, listed as letter from Robert Foegley Land- <br />scape Design and Contracting, Inc. <br />C. Robert Foegley Landscape Design and Contracting, Inc. letter ROBERT <br />dated January 15, 1976: Mr. Brownell advised Mr. Foegley sent FOEGLEY <br />us this letter, and read the contents in its entirety: LANDSCAPE <br />DESIGN & <br />Pete out phone eonvetLsation o4 Januatiy 15, 1976, we agree CONTRACTING, <br />to the extem ion o4 the bid awatt.d 4ot the Pede�sttuan Way, INC. LETTER <br />Phase #3 (Project Ind. R -66) thtough Febtuaty 29, 1976. RE EXTENSION <br />TO AWARD <br />It .iz also undetustood that the beginning o4 construction CONTRACT 7, <br />and the eomptetion dates witt also be delayed. MALL EXTENSION <br />R -66 <br />