6. NSW BUSINESS (Cont'd) <br />Mr. Brownell referred to the quadrant meeting at Riley High <br />School last evening and the Southeast Neighborhood PAC Committee <br />made a very fine report and discussed the park we cleared for <br />them and the houses we rehabilitated and RENEW, Inc., a non- <br />profit organization, has been rehabilitating and refurbishing <br />some houses themselves, and that all of these things ` together <br />have made the neibhgorhood have a new awareness and attempt <br />to build it up. This is the attitude in the neighborhood. <br />Motion was made by Mr. Wiggins, seconded by Mr. Ct a and unani- <br />mously carried, to approve Change Order No. l to Rehabilitation <br />Contract No. 48, for an increase in contract amount of $571.00, <br />or an amended contract total of: $6,897.63, with Ted Combs <br />Decorating & Construction, Inc., Southeast Bureau of Housing, <br />E -7 Project. <br />Change Order No. 2 to Rehabilitation Contract No. 08, Southeast <br />Bureau of Housing, Project E -7: Commission approval was re- <br />quested of Change Order No. 2 to Rehabilitation Contract No. <br />08, with Bailey Electric Company, with no change in contract <br />total or time (Contract total remains at: $4,259.00), with <br />specification change of water heater from electric to gas, <br />and the installation of 10 feet of gas line, for work at: <br />310 East Sample Street, per explanation in memorandum dated <br />January 13, from Chief Inspector, Mr. James L. Johnson, Jr., <br />Southeast Bureau of Housing, E -7. <br />Mr. Wiggins moved for the approval of Change Order No. 2 to <br />Rehabilitation Contract No. 08, with the above specification <br />change and no change in contract total or time, with the <br />contract total remaining at: $4,259.00, with Bailey Electric <br />Company, E -7. Motion was seconded by Mr. Cira and carried. <br />CHANGE <br />ORDER <br />NO. 2 TO <br />REHAB. <br />CONTRACT <br />08, AP- <br />PROVED, <br />SOUTHEAST <br />E -7 PROJECT <br />Change Order No. 1 to Rehabilitation Contract No. 64, Southeast CHANGE <br />Bureau of Housing, Project E -7: Commission approval was re- ORDER <br />quested of Change Order No. 1 to Rehabilitation Contract No. NO. 1 TO <br />64, with Slatile Roofing & Sheet Metal Co., Inc., with no change REHAB. <br />in contract total or time (Contract total remains at: $4,730.00),CONTRACT <br />with specification changes as noted in memorandum dated January 64, AP- <br />13, from Chief Inspector, Mr. James L. Johnson, Jr., Southeast PROVED, <br />Bureau of Housing, for rehabilitation work at: 522 East Haney SOUTHEAST <br />Avenue. E -7 PROJECT <br />Mr. Brownell read this memorandum in its entirety, and the <br />specifications called for the installation of 1/4" underlayment <br />and tile in the hallway, bedroom #1, and bedroom #2. The home- <br />owner has requested that these floors be refinished. Slatile <br />Roofing has agreed to refinish the floor for the same price <br />listed on their bid for the installation of tile; therefore, <br />staff recommends the change order for approval. <br />The Chair advised that some of these contractors are very co- <br />operative in making these requested changes, made at the request <br />of the homeowner. Some of the contractors cooperate and others <br />just don't want to do it and will not get into this type of work <br />- 24 - <br />