Laserfiche WebLink
6. NEWIBUSINESS (Cont'd) <br />c <br />Motion was made by Mr. Chenney, seconded by Mr. Donaldson and <br />carried, for the President and Secretary to be authorized to <br />execute the above - stated Quit -Claim Deed, for the Southeast <br />Neighborhood No. 1, NDP Project A -10. <br />Change Order No. 1 to Rehabilitation Contract No. SECD /PR /CS- CHANGE <br />1/03, E -7: Commission approval was requested for this Change ORDER 1 TO <br />Order, with the Bailey Electric Company, for an increase in CONTRACT <br />contract amount of $394.00, (Contract: $5,718.00), or an 1/03, E -7, <br />amended contract total of: $6,112.00, for rehabilitation work APPROVED <br />at: 630 East Indiana Avenue, Southeast Project E -7. <br />The Chair called on Mr. Keith P. Crighton, Director, Bureau of <br />Housing, to explain this change order. The documentation was <br />included in the packets. <br />Mr. Crighton advised the original inspection for this particular <br />home had included the repair of the first -floor bathroom walls <br />that was due to water damage. We felt the items, in the amount <br />of $113.00, should be deleted because there was 7" of rain in <br />August and the deterioration continued and we decided to request <br />the following items be added to the change order and repair the <br />damage to the bathroom walls, which includes removing the plastic <br />tile, upper congolium, install drywall, and seal, sand, tape, <br />prime, and paint two coats, using non - porous latex semi -gloss <br />enamel, and on the ceiling install the drywall, seal, sand <br />tape, prime and paint with two coats, amounting to $507.00, less <br />the deletion items amounting to $113.00, or a total increase to <br />the contract amount of $394.00, for an amended contract total of: <br />$6,112.00. <br />Mr. Wiggins moved for the approval of the above Change Order No. 1 <br />to Rehabilitation Contract No. SECD /PR /CS -1/03, for an increase <br />in contract amount of $394.00, or an amended contract total of: <br />6,112.00, E -7. <br />d. IChange Order No. 1 to Rehabilitation Contract No. SECD /PR /CS- <br />1/04, E -7: Commission approval was requested for this Change <br />Order, with the Bailey Electric Company, for an increase in <br />contract amount of $1,054.00, (Contract: $2,405.00), or an <br />amended contract total of: $3,459.00, for rehabilitation <br />work at: 608 East Haney Street, Southeast Project E -7. <br />he Chair again called on Mr. Crighton to respond to the <br />hange order. The documentation was included in the packets <br />lso. <br />1r. Crighton advised at the time of inspection, this furnace was <br />iot operating because it was during the summer. His staff had no <br />indication of what condition the furnace was in, although it was <br />)ld, so our specification merely stated that this furnace was to <br />- 9 - <br />CHANGE <br />ORDER 1 TO <br />CONTRACT <br />1/04, E -7, <br />APPROVED <br />