6. NEW BUSINESS (Cont'
<br />Motion was made by Mr. Chenney, seconded by Mr. Donaldson and
<br />carried, for the President and Secretary to be authorized to
<br />execute the above- stated Quit - Claim Deed, for the Southeast
<br />Neighborhood No. 1, NDP Project A -10.
<br />c. Change Order No. l to Rehabilitation Contract No. SECD /PR /CS-
<br />1/03, E -7: Commission approval was requested for this Change
<br />Order, with the Bailey Electric Company, for an increase in
<br />contract amount of $394.00, (Contract: '$5,718.00), or an
<br />amended contract total of: $6,112.00, for rehabilitation work
<br />at: 630 East Indiana Avenue, Southeast Project E -7.
<br />The Chair called on Mr. Keith P. Crighton, Director, Bureau of
<br />Housing, to explain this change order. The documentation was
<br />included in the packets
<br />Mr. Crighton advised the original inspection for this particular
<br />home had included the repair of the first -floor bathroom walls
<br />that was due to water damage. We felt the items, in the amount
<br />of $113.00, should be deleted because there was 7" of rain in
<br />August and the deterioration continued and we decided to request
<br />the following items be added to the change order and repair the
<br />damage to the bathroom walls, which includes removing the plastic
<br />tile, upper congolium, install drywall, and seal, sand, tape,
<br />prime, and paint two coats, using non - porous latex semi -gloss
<br />enamel and on the ceiling install the drywall, seal, sand
<br />tape, prime and paint with two coats, amounting to $507.00, less
<br />the deletion items amounting to $113.00, or a total increase to
<br />the contract amount of $394.00, for an amended contract total of:
<br />$6,112.00.
<br />Mr. Wiggins moved for the approval of the above Change Order No. 1
<br />to Rehabilitation Contract No. SECD /PR /CS -1/03, for an increase
<br />in contract amount of $394.00, or an amended contract total of:
<br />6,112.00, E -7.
<br />d. Change Order No. 1 to Rehabilitation Contract No. SECD /PR /CS-
<br />1/04, E -7: Commission approval was requested for this Change
<br />Order, with the Bailey Electric Company, for an increase in
<br />contract amount of $1,054.00, (Contract: $2,405.00), or an
<br />amended contract total of: $3,459.00, for rehabilitation
<br />work at: 608 East Haney Street, Southeast Project E -7.
<br />The Chair again called on Mr. Crighton to respond to the
<br />change order. The documentation was included in the packets
<br />also.
<br />Mr. Crighton advised at the time of inspection; this furnace was
<br />not operating because it was during the summer. His staff had no
<br />indication of what condition the furnace was in, although it was
<br />old, so our specification merely stated that this furnace was to
<br />CHANGE
<br />ORDER 1 TO
<br />CONTRACT
<br />1/03, E -7,
<br />APPROVED
<br />CHANGE
<br />ORDER 1 TO
<br />CONTRACT
<br />1/04, E -7,
<br />APPROVED
<br />
|