Laserfiche WebLink
[1A <br />e <br />f. <br />Change Order No. l to Rehabilitation Contract No. 26, E -7: <br />Commission approval was requested for Change Order No. 1 to <br />Rehabilitation Contract No. 26, with A.B.C.° Plumbing and <br />Heating Company, for an increase in contract amount of <br />$560.00 (Contract: $6,422.55), or an amended contract total <br />of: $6;982.55, for rehabilitation work at: 611 Wenger Street, <br />Southeast Project E -7. <br />Mr. James L. Johnson, Jr., Chief Inspector, Southeast <br />Bureau of Housing, in his written memorandum to Mr. Keith <br />P. Crighton, Director, Bureau of Housing, states the speci- <br />fications called for the replacement of the kitchen sink <br />faucets, trap, and plumbing lines. Since the time of the <br />initial inspection further water damage has caused the <br />deterioration of the sink base cabinet and the floor. The <br />first floor bathroom lavatory has pulled away from the wall <br />and the faucets need to be replaced. These conditions are <br />causing a health problem and should be corrected. <br />Mr. Ken Schaller advised they need to install an underlayment <br />and tile. The floor has since deteriorated because of the <br />leaking of the plumbing lines. In the kitchen they are re- <br />placing the metal sink base cabinet and the double bowl- stain- <br />less steel sink. In the bathroom, the lavatory faucets are <br />being replaced, and the metal legs are being installed in <br />order to support the lavatory. Commissioner Wiggins asked <br />if the subfloor is still viable there and Mr. Schaller <br />advised that it is. <br />The Chair also asked if the City Council has approved this <br />contract, and Mr. Schaller advised it has received approval. <br />Mr. Wiggins moved for the approval of Change Order No. 1 to <br />Rehabilitation Contract No. 26, with A.B.C. Plumbing and <br />Heating Company, for an increase in contract amount of <br />$560.00, or total amended contract of: $6,982.55. <br />Goodson -Tyler & Associates Contract: Mr. Brownell requested <br />this additional item be added for Commission approval. The <br />Commission had previously approved a contract with Goodson - <br />Tyler & Associates to do an audit on Project A -10, through <br />September 30, 1975, for $1,810.00. This contract has been <br />approved by the Regional Office of HUD, in Chicago, and by <br />the Area Office of HUD, in Indianapolis. However, the A -10 <br />Project will not be closed out until December -- hopefully it <br />will be closed out in December - -so we are suggesting that <br />the audit period be increased from September 30 through <br />December 31. Mr. Brownell advised he was informed this <br />additional cost would be in the approximate amount of <br />$100.00 to the original contract amount. <br />- 7 - <br />CHANGE ORDER <br />NO. 1 TO RE- <br />HABILITATION <br />CONTRACT 26. <br />APPROVED, E -7 <br />GOODSON -TYLER <br />& ASSOCIATES <br />CONTRACT <br />AMENDMENT <br />APPROVED, A -10 <br />