Laserfiche WebLink
5. OLD BUSINESS (Cont'd) <br />91 <br />$7.50 as has been the City's; it is being increased to $15.00 <br />so we are suggesting an increase here of $15.00. <br />These are the only changes in the Personnel Policy at this time. <br />Motion was made by Mr. Wiggins, seconded by Mr. Chenney and <br />carried, for the adoption of the above changes in the Personnel <br />Policy, City of South Bend, Department of Redevelopment. <br />EW BUSINESS <br />National Bank and Trust Company's proposed park on the old <br />Kres e's site, Project Indiana R -66: Mr. Brownell advised <br />the plans for the park have been presented to us for approval <br />by the Urban Design Review Committee. The Committee has ap- <br />proved the plans, and Mr. Edwin R. Bauer, our architect, <br />gave a brief review of the displayed plans. <br />They have been building a wood bulk head along the side of <br />Robertson's building and along side of the bank building. <br />The plans call for a concrete walk curbing along the end <br />and there will be contoured mounds in a winding brick walk- <br />way through it. This walkway will be lighted and there will <br />be a series of benches. The drawings show various plantings <br />that are proposed, ground covers, mounds with seasonal plant- <br />ings, post lights and 8" curbing. <br />This will make a very attractive addition to the River Bend <br />Plaza. The park is temporary until the National Bank con- <br />summates their building plans. <br />Motion was made by Mr. Wiggins, seconded by Mr. Chenney and <br />carried, to accept the proposed plans, as approved by the Urban <br />Design Review Committee. <br />PARK PLANS <br />APPROVED, <br />R-66 <br />Change Order No. 1 to Contract No. 3, E -7: Authorization CHANGE ORDER <br />was requested for the approval of this Change Order, with NO. 1 TO <br />Madison Builder's, Inc., for an increase in contract amount CONTRACT <br />of $336.00, (Contract: $5,799.00), or an amended contract NO. 3 AP- <br />total of $6,135.00, for rehabilitation work at: 1016 South PROVED, E -7 <br />Carroll Street, Southeast Project E -7. <br />Mr. James L. Johnson, Jr., Chief Inspector for Southeast <br />Project E -7, in his written memorandum advised the specifi- <br />cations called for covering the north side and front and <br />rear porches, and also over the bay window to install metal <br />edging, eight squares. Since the time of the initial inspec- <br />tion, the rear porch has continued to leak, thereby causing <br />extensive damage to the rafters, sheathing and ceiling. The <br />items present a health and safety problem and should be cor- <br />rected. <br />Mr. Keith P. Crighton, Director, Bureau of Housing, advised <br />the contractor, in replacing the roof, discovered that the <br />