Laserfiche WebLink
7. NEWIBUSINESS (Cont'd) <br />The memorandum from Mr. James Johnson, Chief Inspector for the <br />Southeast Bureau of Housing, advises that the technical speci- <br />fications call for securing the present lavatory to the wall. <br />To complete the job properly, the staff agrees with the con- <br />tractor and the homeowner that supply lines, shut -off valves, <br />P- .trap, and vent arm should also be installed. The additional <br />cost would be $67.00. The lavatory is located in the second <br />floor bathroom near all of the bedrooms and is not working pre - <br />sently. This presents a serious health problem and should be <br />corrected. <br />Commissioner Chenney asked what the situation physically might <br />be, as the supply labor and materials are for the hookup of <br />the lavatory. Mr. Keith Crighton, Director, Bureau of Housing <br />Program, explained the original inspection was over a year ago, <br />and we have no way of referring to what actually existed as we <br />have none of the inspectors on the staff that were with us at <br />that time. The original inspection, at that time, may have been <br />good. However, the present condition on that lavatory needs the <br />above work to make it operable. It is a needed $67.00, and it is <br />a bargain for the amount of money. <br />Motion was made by Mr. Chenney, seconded by Mr. Wiggins and <br />carried, for the approval of Change Order No. I to Rehabilita- <br />tion Contract No. 34, for an increase in contract amount of <br />$67.00, with an amended contract total of $3,736.77, subject to <br />Legal Counsel approval. <br />e. Change Order No. l to Rehabilitation Contract No. 37, E -7: <br />Approval was requested of this Change Order, which the Con- <br />tractor is requesting in addition to their contract for replac- <br />ing a rotted subfloor under the tub, and fixing the leak and <br />overflow on it to meet the South Bend plumbing code, at 507 East <br />Keasey Street, for an increase in contract amount of $143.80, <br />with an amended contract total of: $5,174.41, and no change in <br />time, Project E -7, Bureau of Housing. The contract is with Ted <br />Combs Decorating & Construction Company. <br />Mr. James Johnson, Chief Inspector for the Southeast Bureau of <br />Housing, in his memorandum, advises the technical specifica- <br />tions call for 1/4" underlayment and tile to be installed in <br />the bathroom. Upon removal of the existing tub, it was found <br />that approximately 10 square feet of subfloor was deteriorated, <br />and that the tub overflow was not connected in a proper manner. <br />As this is the only bathroom in the home, the staff had in- <br />structed Ted Combs Decorating and Construction Company to pro- <br />ceed with the changes immediately in order to provide bath <br />facilities to the family as soon as possible. `The staff re- <br />commends the change order be approved. <br />CHANGE <br />ORDER NO. <br />1 TO REHAB. <br />CONTRACT <br />NO. 37 <br />APPROVED, <br />E-7 <br />