6. NEW BUSINESS (Cont'
<br />Motion was made by Mr. Cira, seconded by Mr. Donaldson and
<br />carried, for authorization to enter into the above Commercial
<br />Lease with Nautilus Construction Company and the President
<br />authorized to execute the Lease.
<br />b.
<br />Change Order No. 1 to Plaza
<br />Park Contract No. 1: Commission
<br />CHANGE ORDER
<br />Com-
<br />approval was .requested of
<br />this Change Order, which
<br />is for a
<br />NO. 1 TO
<br />which
<br />decrease in contract amount
<br />of $10,647.50, with the
<br />Nautilus
<br />PLAZA PARK
<br />East
<br />Construction Corporation of
<br />Elkhart, Indiana, or an
<br />adjusted
<br />CONTRACT NO. 1
<br />an increase in contract amount of $133.00,
<br />contract amount with Nautilus
<br />of: $198,558.50, in
<br />Project
<br />APPROVED, R -66
<br />Madison Builders,
<br />Indiana R -66.
<br />total
<br />E -7
<br />Mr. Brownell advised that we reduced the amount of work they
<br />were to do, which was done prior to the awarding of the con-
<br />tract by the South Bend Park Department and the Board of
<br />Public Works. This reduction has been agreed to by Nautilus
<br />and was requested through our consulting engineer, Lawson
<br />Associates. The existing items of paving were removed, which
<br />amounted to $8,610.00; sidewalk removed, which amounted to
<br />$2,037.50, or a total decrease of $1.0,647.50 to their con-
<br />tract.
<br />Motion was made by Mr. Cira, seconded by Mr. Donaldson and
<br />carried, for the approval of Change Order No. 1 to Plaza
<br />Park Contract No. 1, for a decrease in contract amount of
<br />$10,647.50, with the Nautilus Construction Corporation,
<br />or an adjusted contract amount of: $198,558.50, subject
<br />to HUD and Legal Counsel approval.
<br />c.
<br />Change
<br />Order No.
<br />2 to Rehabilitation Contract No. 5:
<br />Com-
<br />CHANGE ORDER
<br />mission approval
<br />was requested of this Change Order,
<br />which
<br />NO. 2 TO
<br />is for emergency
<br />plumbing and carpentry work at 610
<br />East
<br />CONTRACT 5
<br />Ohio
<br />Street, for
<br />an increase in contract amount of $133.00,
<br />APPROVED,
<br />with
<br />Madison Builders,
<br />Inc., or an amended contract
<br />total
<br />E -7
<br />of:
<br />$4,814.00,
<br />Project E -7, Bureau of Housing.
<br />Mr. Mark S. Davis, Chief Inspector, Southeast Project E -7,
<br />Bureau of Housing, advised that on July 18th, he had in-
<br />structed Mr. Richard Madison, Madison Builders, Inc., to
<br />proceed with the emergency plumbing and carpentry work as
<br />outlined in the Change Order. Upon completing the plumbing
<br />work listed on the.contract, the plumber filled the tub with
<br />water and the water began leaking from under the tub. As
<br />this was a second -floor bathroom, the water was threatening
<br />to damage the first floor closet ceiling. In addition, the
<br />hazard of waste water contaminating food and drawing insects
<br />needed to be corrected immediately.
<br />Motion for the approval of Change Order No. 2 to Rehabilita-
<br />tion Contract No. 5, for an increase in contract amount of
<br />$133.00, with Madison Builders, Inc., was made by Mr. Donald-
<br />son, seconded by Mr. Cira and carried. C.O. subject to
<br />Legal Counsel approval. Amended contract total: $4,814.00.
<br />- 5 -