Laserfiche WebLink
Alterna <br />a -A (Recommended) <br />A new <br />31an between Jefferson and Washington <br />for Block <br />7 <br />(with <br />a fixed <br />stage and roof over stage area, responding to request <br />of <br />Board) <br />and for Block 8 (minimum treatment) would cost: <br />Block <br />7 <br />1. Connection <br />of inlets to storm sewer <br />$ 10,000 <br />to <br />20,000 <br />2. Lowering <br />of water line <br />2,000 <br />to <br />5,000 <br />3. Canopies <br />(simplified system) <br />150,000 <br />to <br />200,000 <br />4. Balance <br />of site work and planting* <br />250,000 <br />to <br />370,000 <br />Sub -Total <br />$412,000 <br />to <br />595,000 <br />*Incl <br />des stage, roof and sound system <br />Block 8 <br />1 <br />2 <br />onnection of inlets to storm sewer <br />alance of site work and planting <br />$ 5,000 to <br />25,000 to <br />10,000 <br />40,000 <br />Sub -Total 30,000 to 50,000 <br />TOTAL (Blocks 7 and 8) $442, 000 to 645,000 <br />The recommended plan, Alternate -A, is within the budget and provides. a <br />stage area of approximately 30'x601, a roof over stage, a seating area for <br />800 to 1,000, and a standing area under trees for 1,500 to 2,000. It is <br />designed to serve all the performances and exhibits requested by the <br />Merchants-Citizens Advisory Committee. It does not include provisions <br />for an Dffice, dressing rooms, toilets and storage area. The dressing <br />rooms and storage area can be accommodated in a trailer to be located <br />on Jeff rson at times of major performances and /or in tents to be located <br />under 1he canopy abutting the stage. <br />To install a sound system on the other whole blocks of the Plaza will <br />cost $2,000 to $2,500 per block. Music can be provided at a rental of <br />$40 per month, per block. <br />The 16 x75' canopy in front of the former Kresge Store will cost between <br />$20,00 and $25,000. <br />