Laserfiche WebLink
April 4, 1975 <br />RIVER BEND PLAZA, SOUTH BEND, INDIANA <br />Summa -y of Alternatives, Cost Data and Recommendations <br />for thel plaza areas between Jefferson and Colfax <br />Altern to -D <br />As presented to the Board and shown on Study D, the development between <br />Jefferson and Madison of an Assembly Area with a lift stage and roof canopy <br />in Block 7 and minimum treatment on existing paving'in Block 8 would cost <br />as follows: <br />Bloc 7 <br />1. Rlelocation of underground utilities <br />and connection of inlets to storm sewer $ 95,000 to 150,000 <br />2. Stage and pit 30'x60' (1 to 8 units) $180,000 to 600,000 ** <br />3. Roof over stage $130,000 to 310,000 * ** <br />4. Canopies and balance of site work and <br />planting* $330,000 to 350,000 <br />5. Sound system $ 5,000 to 10,000 <br />Block 8 <br />1. Connection of inlets to storm sewer $ 5,000 to 10,000 <br />2. Balance of site work, excluding sound $ 25,000 to 35,000, <br />TOTAL $770,000 to 1,465,000 <br />*Does not include ancillary space for office, dressing rooms, toilets and <br />storage areas. <br />** For $180,000 the stage would be a single unit in a simple pit with a <br />minimum of controls and features. The range in cost to $600,000 covers <br />a stage system of from 2 to 8 units with special controls and features. <br />The more complex stages would require additional relocation of utilities <br />as indicated under Item 1. <br />* ** A roof over the stage at $130,000 would be a simple truss with built -up <br />ro f on a standard support system. The roof can be one of five 'other <br />explored designs ranging in price up to $310,000., <br />