Laserfiche WebLink
DisC'USSion,., to-Continue 6nKGza Stape <br />By JEANNE <br />Trion s <br />DERBECH ! <br />tt writer <br />"" The commissioners came to have four rows of built -in seat- <br />Commissioner John Chen - <br />The vision <br />full - <br />no decision but agreed the dis- <br />cussion would continue at their <br />ing fanning out in a semi - circle <br />ney said he was concerned <br />ny orchestra pe <br />performing-on <br />p <br />hydraulically-lifted <br />forming e a <br />stage on <br />next meeting on June 6. ` <br />in the street. The plan seemed <br />to present some problems for - <br />about the merchants and said <br />whatever was done should <br />River <br />River Bend Plaza <br />d Pl <br />looked excit� <br />, The hydraulically- lifted <br />. stage was one of three ideas <br />movement of fire equipment in <br />•� <br />help them. He said he did. not <br />ing to some persons <br />at the <br />proposed for, continuing con - <br />of emergency, but Oes• <br />believe that shows performed <br />Redevelopmen <br />Commtssio'n, <br />siruction of River Bend Plaza <br />teriing said a fire truck would <br />so far on River Bend Plaza <br />meeting today. <br />between Jefferson and <br />be able to get through by driv- <br />have resulted in any more <br />Others at the <br />commission's <br />ington :.. ;Wash- <br />_' ing across the stage under ti <br />business for the merchants. <br />public hearing expressed <br />nerv- <br />The cost of construction <br />canopy above the stage. <br />•The <br />Nautilus Construction of <br />about <br />he cost and <br />would be somewhere between <br />third plan was for a <br />Elkhart was awarded the con- <br />possible <br />possible maint <br />lems of the inn <br />nance rob <br />p <br />vative stage - <br />$770,000 and $1.4, million, de- <br />plaza area with a pool, and <br />p p <br />tract for major construction of <br />Plaza Park for its low base bid <br />in- the - street. <br />. pending on the number of <br />stage levels and other details, <br />greenery in the style of the <br />Plaza already completed. The <br />of $171,349.50 plus $37,856 for <br />After considerable <br />sion, Commissi <br />discus- <br />ner Donald <br />'according to tom oesterlin of <br />g <br />'cost was estimated at between <br />$460,000 and $550,000. <br />alternates added to construc- <br />tiom Nautilus also received <br />summed <br />up his opin- <br />the hickey Co. <br />the contract for dredging un- <br />ion: <br />ion: <br />"There would be a major <br />Edward Soltesz, Who first <br />der the Colfax, Bride and <br />g <br />"We have to <br />ear in mind <br />problem, with the electrical <br />suggested the hydraulically- <br />gg Y y, ; <br />protection of the slope for its <br />that such an expense <br />item cer• <br />;,duct wok which would require <br />lift stage, said Oesterling's es; <br />base bid of $40,000 plus $6,620 <br />tainly would hav <br />to-be com- relocation, he said <br />timates were much too high. <br />for an alternate added. <br />patible with the <br />ind of use It ' <br />A second ro osai for a st . <br />p p a ` <br />He said the stage could be <br />built for <br />The electrical contract for <br />would have. If <br />this project <br />tionary stage at sidewalk level ` <br />$37,000, but refused to <br />Plaza Park went to Colip <br />;gets to be a really <br />involved, <br />on the t west side of. the ' street> <br />say who had drawn up the <br />Brothers Electric Co. for <br />expensive kind of <br />is <br />operation, it <br />would cost between $442,00 and <br />estimate. He would only said <br />the estimate was made by lo• <br />$25,400 total; and the Harry H. <br />Verkler <br />I just. not in the <br />`won't happen." <br />cards and <br />$645,000, Oesterling estimated. <br />The stationary stage would <br />cal people who do such <br />Contractor, Inch won a <br />contract for wheel -chair <br />-. <br />things." ` <br />g <br />ramps downtown for $14,500. <br />