My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sewer and Water Main Extension Agreement - Extension for New Chocolate Factory and Museum – South Bend Chocolate Company
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Sewer and Water Main Extension Agreement - Extension for New Chocolate Factory and Museum – South Bend Chocolate Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:04:52 AM
Creation date
12/23/2019 1:15:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEWER AND WATER MAIN EXTENSION AGREEMENT <br />This Sewer and Water Main Extension Agreement ("Agreement") is made on the day <br />of , 20_ by and between the SBCC Development Corporation ("Owner") and the City of <br />South Bend, a municipal corporation existing under the laws of Indiana, acting by and through its <br />Board of Public Works ("City") <br />WHEREAS, Owner intends to develop 82 of acres located at the SW corner of US 20 and <br />US 31 for a regional visitor destination that includes a chocolate factory and dinosaur museum; <br />and <br />WHEREAS, Owner plans to extend and make additions to existing water and sanitary <br />sewer systems to serve said development as shown on the Exhibit A, attached and incorporated <br />hereto (the "Dedicated Improvements"), and desires certain commitments from City; and <br />WHEREAS, the engineering design for said Dedicated Improvements has been, or will <br />be, accomplished by competent professional engineers registered and licensed in the State of <br />Indiana; and <br />NOW, THEREFORE, in consideration of the obligations, terms and conditions contained <br />herein, the adequacy of which the parties expressly acknowledge, Owner and the City agree as <br />follows: <br />1. Design <br />The Owner shall consult the City and allow the City Engineer or her designee input prior <br />to designating the project engineer who shall be responsible for the engineering design and <br />inspection in connection with the installation of the Dedicated Improvements (the "Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.