My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes -Cleveland South Well Field Bulk Fluoride Tank Replacement Proj No. 118-021B - HRP Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes -Cleveland South Well Field Bulk Fluoride Tank Replacement Proj No. 118-021B - HRP Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:16:55 PM
Creation date
12/23/2019 11:18:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
+t�►a <br />ro� r# rrt^h CITY OF SOUTH BEND INDIANA <br />CONTI ACTOR'"UOTE FOR PUBLIC ' QRK <br />PROJECT NAME: Cleveland South Well Field — Bulk Fluoride Tank Replacement <br />PROJECT NO. 118-021B <br />QUOTES DUE December 19, 2019 by 10:30 AM <br />(Must be completed for all quotes. Please type or print) <br />Date: 12/19/19 Firm: HRP CONSTRUCTION INC. <br />Address: 5777 Cleveland Road, P.O. Box 266 <br />City/State/Zip: South Bend, IN 46624-0266 Telephone Number: ( 574 ) 271-7800 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Cleveland South Well Field - Bulk Fluoride Tank Replacement <br />the City of South Bend, Indiana. in accordance with plans and specifications prepared by: <br />DLZ Indiana. LLC <br />and dated December 6, 2019 for the sum of (enter the Total Quote as shown on the Proposal) <br />See Attached $ L <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />By <br />(Signs ) <br />Matthew D. Cain, President <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />Laura L. O'Sullivan, Member <br />ACCEPTANCE <br />day of <br />Genevieve E. Miller, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />20 <br />Version 4/2/2019 Page - 30 Public Works Quote <br />Cleveland South Well Field — Bulk Fluoride Tank Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.